ENTSOG GRIP CEE 2014-2023 / Annex B : Infrastructure Projects

POLAND

TRA-N-247

The North-South corridor in Western Poland

Non-FID

Pipeline including CS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter Operator TEN-E Project ?

GAZ-SYSTEM S.A. GAZ-SYSTEM S.A.

Project of Common Interest Yes

Interested by PCI ? IGAs

None

en.gaz-system.pl/nasze-inwestycje/krajowy-system- przesylowy/

Web Link

Gas Transmission Operator GAZ- SYSTEM S.A. (100%)

THIRD-PARTY ACCESS REGIME

SCHEDULE

TECHNICAL INFORMATION

Applied for Exemption ? Exemption granted ? Considered TPA Regime Considered Tariff Regime

End of permitting phase

# of Pipelines, nodes, CS Total Pipeline Length (km)

Regulated Regulated

10 +739,00

FID Construction Commissioning Last completed Phase :

2015

Total CS Power (MW) Expected Load Factor

No

+7,00

Not relevant

2018

% Exemption in entry direction % Exemption in exit direction

0%

Planned

0%

| 149

GRIP Central Eastern Europe 2014–2023 Annex B

Made with