ENTSOG GRIP CEE 2014-2023 / Annex B : Infrastructure Projects

ROMANIA

TRA-F-142

Reverse flow at Negru Voda

FID

Pipeline including CS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter Operator TEN-E Project ?

Not part of TEN-E Yes Transgaz SNGN Transgaz S.A.

Interested by PCI ? IGAs

None

WƌŝǀĂƚĞ &ŝŶĂŶĐŝŶŐ ;ϱϬ͕ϬϬйͿ

WƵďůŝĐ &ŝŶĂŶĐŝŶŐ ;ϱϬ͕ϬϬйͿ

Web Link

dƌĂŶƐŐĂnj ;ϭϬϬйͿ

THIRD-PARTY ACCESS REGIME

SCHEDULE

TECHNICAL INFORMATION

Applied for Exemption ? Exemption granted ? Considered TPA Regime Considered Tariff Regime

End of permitting phase

# of Pipelines, nodes, CS Total Pipeline Length (km)

Regulated Regulated

1

FID Construction Commissioning Last completed Phase :

2010

Total CS Power (MW) Expected Load Factor

No

Not relevant

2013

% Exemption in entry direction % Exemption in exit direction

0%

Permitting

0%

| 172

GRIP Central Eastern Europe 2014–2023 Annex B