ENTSOG GRIP CEE 2014-2023 / Annex B : Infrastructure Projects

BULGARIA

TRA-N-137

Interconnection Bulgaria - Serbia

Non-FID

Pipeline including CS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter Operator TEN-E Project ?

Bulgarian Ministry of Economy and energy (MEE) Bulgartransgaz EAD

Not part of TEN-E Yes

Interested by PCI ? IGAs

3

ƵůŐĂƌŝĂŶ ƐĞĐƚŝŽŶ͕ DŝŶŝƐƚƌLJ ŽĨ ĐŽŶŽŵLJ

^ĞƌďŝĂŶ ƐĞĐƚŝŽŶ͕ ^ĞƌďŝũĂŐĂƐ ;ϭϬϬйͿ

ĂŶĚ ŶĞƌŐLJ ŽĨ ƵůŐĂƌŝĂ ;ϭϬϬйͿ

Web Link

ǁǁǁ͘ďƵůŐĂƌƚƌĂŶƐŐĂnj͘ďŐ

WƵďůŝĐ &ŝŶĂŶĐŝŶŐ ;ϵϵ͕ϬϬйͿ

THIRD-PARTY ACCESS REGIME

SCHEDULE

TECHNICAL INFORMATION

Applied for Exemption ? Exemption granted ? Considered TPA Regime Considered Tariff Regime

End of permitting phase

# of Pipelines, nodes, CS Total Pipeline Length (km)

Regulated Regulated

2014

2

FID Construction Commissioning Last completed Phase :

2014

+155,00

Total CS Power (MW) Expected Load Factor

No

2015 2015

No

% Exemption in entry direction % Exemption in exit direction

0%

Planned

0%

| 21

GRIP Central Eastern Europe 2014–2023 Annex B