ENTSOG GRIP CEE 2014-2023 / Annex B : Infrastructure Projects

AUSTRIA

TRA-N-021

Bidirectional Austrian-Czech Interconnector (BACI, formerly LBL project)

Non-FID

Pipeline including CS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter Operator TEN-E Project ?

Project of Common Interest Yes Gas Connect Austria GmbH Gas Connect Austria GmbH

Interested by PCI ? IGAs

None

Pipeline on Austrian territory, GAS CONNECT AUSTRIA GmbH (100%)

Pipeline on Czech territory, NET4GAS, s.r.o (100%)

Web Link

TEN-E Requests

Date of Request

Year Funding Granted

27.02.2012

2013

THIRD-PARTY ACCESS REGIME

SCHEDULE

TECHNICAL INFORMATION

Applied for Exemption ? Exemption granted ? Considered TPA Regime Considered Tariff Regime

End of permitting phase

# of Pipelines, nodes, CS Total Pipeline Length (km)

Regulated Regulated

2 +58,00

FID Construction Commissioning Last completed Phase :

Total CS Power (MW) Expected Load Factor

No

+24,00

Not relevant

2019

% Exemption in entry direction % Exemption in exit direction

0%

Planned

0%

| 3

GRIP Central Eastern Europe 2014–2023 Annex B