ENTSOG GRIP CEE 2014-2023 / Annex B : Infrastructure Projects

CZECH REPUBLIC

TRA-N-136

Poland-Czech Republic Interconnection within the North-South Corridor (STORK II)

Non-FID

Pipeline including CS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter Operator TEN-E Project ?

NET4GAS, s.r.o. NET4GAS, s.r.o.

Project of Common Interest Yes

Interested by PCI ? IGAs

None

from Kedzierzyn to ,Ăƛ;  ĂŶĚ W> border), GAZ-SYSTEM S.A. (PL) (100%)

ĨƌŽŵ >ŝƓƛ ƚŽ ,Ăƛ (CZ and PL border), NET4GAS, s.r.o. (CZ) (100%)

Web Link

THIRD-PARTY ACCESS REGIME

SCHEDULE

TECHNICAL INFORMATION

Applied for Exemption ? Exemption granted ? Considered TPA Regime Considered Tariff Regime

End of permitting phase

# of Pipelines, nodes, CS Total Pipeline Length (km)

Regulated Regulated

1 +107,00

FID Construction Commissioning Last completed Phase :

Total CS Power (MW) Expected Load Factor

No

No

2019

% Exemption in entry direction % Exemption in exit direction

0%

Planned

0%

| 56

GRIP Central Eastern Europe 2014–2023 Annex B

Made with