ENTSOG GRIP CEE 2014-2023 / Main Report

Image courtesy of Gasunie

For the network analysis , the following demand cases have been defined: \\ Design Case (DC) \\ Average day: full year (AD)/summer (AS)/winter (AW) \\ One/14-day Uniform Risk in the CEE region, winter average in rest of the EU (CEE UR/EU AW; CEE 2W UR/EU AW) The goal of the analysis is an assessment whether the infrastructure is capable to serve the demand. For the network resilience analysis , the impact of different disruption scenarios on the gas supply is investigated. For this purpose, a disruption of the UA route, the BY route and a simultaneous disruption of both routes is simulated, with both FID and non-FID projects implemented. As a third step, the supply source dependencies and the supply source mix of each CEE county are analysed. It is crucial, not only in terms of security of supply, but also in terms of a functioning competition within the market, to gain information on this issue as a basis for further development of the gas transmission system within Europe towards increased overall efficiency and ensuring competitive prices of energy.

GRIP Central Eastern Europe 2014–2023 |

23

Made with