5.1.3 Croatia
The supply corridor on the following picture shows the main supply corridors for Croatia which are through Slovenia (HR1) and Hungary (HR2). Both supply corri- dors are for domestic demand at the moment. Croatia has its own gas production and the underground gas storage so it is not entirely dependent on import. After 2019 Croatia will become a transit country thanks the finishing of the LNG terminal and the Ionian Adriatic Pipeline.
PL
DE
CZ
SK
HU
RO
AT
HR1
HR2
SI
HR
2018
2019
Cross-border Entry Capacity 2014 (E_CB) Cross-border Entry Capacity – planned 2015–2023 (E_CB) UGS/Production Entry Capacity (E_UGS/P) – withdrawl UGS Exit Capacity (X_UGS) – injection Domestic Exit Capacity required for demand (X_DOM)
BG
2020
HR1 Main Supply Corridor for HR HR2 2 nd Supply Corridor for HR
Figure 58: N-1 in CEE Region – HR