ENTSOG GRIP CEE 2014-2023 / Main Report

5.1.6 Poland

The picture below illustrates the main supply corridors for Poland. Under normal conditions they run through Belarus (marked as PL1) and Ukraine (PL2). Addition- ally, the gas market in Poland might be supplied by means of interconnections with Germany and the Czech Republic (marked as PL3 and PL4 correspondingly). In 2014 the LNG terminal in Świnoujście will be finished. Commissioning of new inter- connection projects with the Czech Republic and Slovakia are planned for 2019. The cross border project with Lithuania (GIPL) and Denmark are planned to be put in operation in 2021 and 2020, respectively.

DK

LT

PL1 PL1 PL1

2021

2014 2020

PL3

PL3

PL3

PL

DE

PL3

PL4

2019

2019

PL2

SK

CZ

HU

RO

AT

SI

HR

Cross-border Entry Capacity 2014 (E_CB) Cross-border Entry Capacity – planned 2015–2023 (E_CB) UGS/Production Entry Capacity (E_UGS/P) – withdrawl UGS Exit Capacity (X_UGS) – injection Domestic Exit Capacity required for demand (X_DOM) PL1 Main Supply Corridor for PL PL2 2 nd Supply Corridor for PL PL3 3 rd Supply Corridor for PL PL4 4 th Supply Corridor for PL

BG

Figure 61: N-1 in CEE Region – PL

72 |

GRIP Central Eastern Europe 2014–2023

Made with