ENTSOG GRIP CEE 2014-2023 / Main Report
Abbreviations
AD
Average day demand
AS
Average summer demand
AW
Average winter demand
BACI
Bidirectional Austrian-Czech Interconnector
BEMIP gas
Baltic Energy Market Interconnection Plan in gas
CEE 2W UR/EU AW
Two-week Uniform Risk Day in whole CEE Region, Average Winter Day in the rest of the EU
CEE 2W UR/EU AW
14-day Uniform Risk in the CEE region, winter average in rest of the EU
CEE GRIP
Central-Eastern Europe Gas Regional Investment Plan
CEE UR/EU AW
Single Uniform Risk Day in whole CEE Region, Average Winter Day in the rest of the EU
CEF
Connecting Europe Facility
CS
compressor station
DC
Design Case
DEg
GASPOOL
DEn
NetConnect
DIR 2009/73 Directive 2009/73/EC of 13 July 2009 concerning common rules for the internal market in natural gas and repealing Directive 2003/55/EC EC European Commission ERDF European Regional Development Fund EU European Union FID final investment decision GIPL Gas Interconnection Poland-Lithuania IP interconnection point ITB Interconnection Turkey-Bulgaria LNG Liquefied natural gas LSO LNG System Operator MEET Bulgarian Ministry of Economy, Energy and Tourism MW megawatt NEP Netzentwicklungsplan NP national production NSI East Gas North-South gas interconnections in Central Eastern and South Eastern Europe PCI projects of common interest REG 347/2013 Regulation (EU) No 347/2013 of the European Parliament and of the Council of 17 April 2013 on guidelines for trans-European energy infrastructure and repeal- ing Decision No 1364/2006/EC and amending Regulations (EC) No 713/2009, (EC) No 714/2009 and (EC) No 715/2009
REG 715/2009
Regulation (EC) No 715/2009 of 13 July 2009 on conditions for access to the natural gas transmission networks and repealing Regulation (EC) No 1775/2005 Regulation (EU) No 994/2010 of the European Parliament and of the Council of 20 October 2010 concerning measures to safeguard security of gas supply and repealing Council Directive 2004/67/EC
REG 994/2010
88 |
GRIP Central Eastern Europe 2014–2023
Made with FlippingBook