FY 15 Budget Review
5230 Waste Water Treatment Plant
Total Request $465,000
1 Pump Station Electrical Assessment, Inspection & Service
$100,000
Contract services to inspect, assess and service medium power electrical gear, cables and cabinets at seven critical pump and lift stations on an annual basis. IT is critical that we have knowledge of potential electrical issues with our major pump/lift station, that we correct any deficiencies and/or abnormalities and that we perform routine electrical predicative and preventive maintenance measures to ensure station(s) reliability.
2 ARC Flash Assessment, Labeling & Training
$125,000
An electrical coordination study and an ARC flash study, labeling and staff training project would ensure compliance with existing and future electrical safety requirements.
3 ARV Replacement Program
$240,000
Air Release Valve (ARV) inspection and maintenance program for the City's approximately 500‐600 ARVs along pump station force mains. The City has not invested the resources into an inspection, assessment, repair, replacement and preventive maintenance program since before 2008. Their exact location are largely unknown and they do not exist on a database map. If unserviced, they cause pumping and force main issues and extended pump runtimes.