FY 15 Budget Review
FY 15 Capital Supplemental Request Summary
Total Request $2,889,000
5220 Water Treatment Plant
1 UV Equipment/EMJ Recycle
30,000 70,000 30,000 40,000 40,000 64,000 30,000 40,000 40,000 95,000 40,000 20,000 20,000 40,000
2 DEB Boiler Natural gas Conversion
3 UV Equipment/DEB
4 Low Voltage Electrical Panel Replacement
5 Filter Console Upgrades
6 Ozone Equipment Replacement 7 Zebulon Booster Pump # 3 Rebuild 8 Mt Herman Booster Pumps Rebuild 9 Wetsgate Booster Pumps Rebuild 10 Ion Chromatography System 11 EMJ Plant Entry Gate Upgrades 12 Filtrate Pump Control Panel
13 Gantry/Davit Crane
14 THM Analyzer
Total
$599,000
5230 Waste Water Treatment Plant
190,000 $190,000
1 NRWWTP Training Facility Parking Lot
Total
5250 Sewer Maintenance
40,000 25,000 $65,000
1 Valve Exerciser
2 Trenchless Point Repair System
Total
5280 Meters
1 Meter Replacements
2,000,000 $2,000,000
Total
5285 Utilities Support
1 Canopy Racks
35,000 $35,000
Total