PPM 5250-633

Work Process Instruction (WPI) City of Raleigh Public Utilities Department

Number WPI.5250.633.2018.01

SUBJECT Updating FOG Customer Master Inspection

REV

EFFECTIVE DATE

PAGE

OF

1

1

PREPARED BY: Title

Approved by Title

Supersedes

Signature____________________________

Signature___________________________________

1.0 Purpose : To provide instruction for updating the FOG Customer Master Inspection 2.0 Scope

3.0 Records

4.0 Associated Documents FOG-0004 Risk Levels 5.0 Definitions

6.0 Responsibility

7.0 Tools, Gauges, Fixtures

8.0 Safety Requirements

9.0 Instructions Enter or Confirm the following fields on the FOG Customer Master Inspection A. The Location field has current name of FSE/VMF

PRINTED COPIES ARE UNCONTROLLED

40

Made with FlippingBook - Online catalogs