TRANSBAY TOWER, 101 1
S T
STREET – LEED
PLATINUM
San Francisco, CA
Type
: Mixed-Use
Size
: 1.4M SF
The project consists of approximately 1.4 million SF of Class A office space over
60 floors with a building height of 1,070 feet tall. The building was a mix use of
office, transportation, retail, and residential uses. As a project manager Marcus
Keay was responsible for the design and coordination of the core and shell
Mechanical, Electrical, Plumbing and Fire Protection systems. The construction
cost for this project was $1.1 billion. The software used was Revit. The project is
pre-certified LEED Platinum and is scheduled to be completed in the fall of
2017.