TRANSBAY TOWER, 101 1

S T

STREET – LEED

PLATINUM

San Francisco, CA

Type

: Mixed-Use

Size

: 1.4M SF

The project consists of approximately 1.4 million SF of Class A office space over

60 floors with a building height of 1,070 feet tall. The building was a mix use of

office, transportation, retail, and residential uses. As a project manager Marcus

Keay was responsible for the design and coordination of the core and shell

Mechanical, Electrical, Plumbing and Fire Protection systems. The construction

cost for this project was $1.1 billion. The software used was Revit. The project is

pre-certified LEED Platinum and is scheduled to be completed in the fall of

2017.

* Completed by AlfaTech principal during previous employment