Previous Page  31 / 72 Next Page
Information
Show Menu
Previous Page 31 / 72 Next Page
Page Background

181 FREMONT – LEED PLATINUM

San Francisco, CA

Type

: Mixed-Use

Size

: 435,000 SF

The 800-foot tall, 70-story mixed use high rise project centrally located in

Downtown San Francisco Transit Center district includes 432,000 square feet of

Class A office space located in the Low and Mid Rise sections of the building

with an Amenities Level connecting to the 17 Ultra Luxury Residential High Rise

floors. The construction cost was around $500 million. The software used was

Revit. The project is scheduled to be completed in the fall of 2017 and is

seeking to achieve LEED Platinum Certification.

* Completed by AlfaTech principal during previous employment

Facebook

MI XED USE | RETAI L | HOSP I TAL I TY