The UK Offshore Oil and Gas Fabricators Directory 2014 - page 13

page 13
THE UK OFFSHORE OIL AND GAS FABRICATORS DIRECTORY
2014
Capabilities and Capacities – Facility 1
(continued)
Dry-Dock Capability
Dry Dock 1
• 259.08 metres x 45.72 metres (entrance 44.2 metres)
• -5.6 metres CD (high water ordinary spring tides (HWOST) –
10.67 metres)
• Filling 1.5 hours
• Dewatering 2.5 hours
• Cranage:
- 2 x 100 tonnes at 43 metre radius
- 1 x 50 tonnes at 40 metre radius
• Serviced by two 100 tonne rail-mounted cranes, plus a 50 tonne
rail-mounted crane
• Sonar and floating, production, storage and offloading (FPSO) vessel
Spider pits
Dry Dock 7
• 151 metres x 20 metres
• 2.1 metres CD (MHWS – 7.1 metres)
Other e.g. Licences,
Permissions, Warehouse
and Storage Size,
Engineering, Electrical
and Joiners Workshop
Size
• Waste Disposal Licence
• Port Security Certification
• 24-hour security team onsite – full CCTV
• Onsite blasting and painting cells
• Machine shop – 1,235 m
2
• Pipe workshop – 850 m
2
• Onsite long-term agreement subcontractors for works such as
electrical, pipework, scaffolding, insulation, etc
• 21 metres length x 21 metres width x 25 metres height blast cell
• 21 metres length x 21 metres width x 25 metres height paint cell
• Certified ISO 9001 Quality Management System
• Certified ISO 14001 Environmental Management System
• FPAL accreditation
• Painting permit – Environment Agency
• Waste disposal handled by contractors
• Air draught restriction of +76.6 metres reference CD
>