THE UK OFFSHORE OIL AND GAS FABRICATORS DIRECTORY
2014
Capabilities and Capacities – Invergordon Cluster
Total Area (m²)
182,108 m
2
Fabrication Area Covered
(m²)
• Service base – 6,100 m
2
• Inland facility – 3,530 m
2
Assembly and Erection
Area (m²)
• Service base – 12,000 m
2
• Inland facility – 16,000 m
2
Cranage – Lifting Capacity
and Hook Height
(Tonnes and Metres)
Service Base
• Main assembly – 4 x 20 tonnes
• Piping shops – 3 x 10 tonnes
Inland facility
• 3 x 10 tonnes, hook height 7.1 metres; 1 x 5 tonnes, hook height
7.1 metres
• External crane capacity of 1,000 tonnes plus a pool of heavy lift
cranes and modular trailers available as required
Load-Out Capacity
(Tonnes)
• Crane lift up to 1,000 tonnes
• Roll-out up to 3,000 tonnes
Minimum Water Depth
(Metres)
Eight metres LAT
Maximum Water Depth
(Metres)
14 metres MHWS
Dry-Dock Capability
Wet dock – Queens Dock at Invergordon Harbour available
(10.9 metres LAT)
Other e.g. Licences,
Permissions, Warehouse
and Storage Size,
Engineering, Electrical
and Joiners Workshop
Size, etc.
• Quay 1 – 50 metres long with 50 tonne mooring bollards
• Quay 2 – 150 metres long with 50 tonne and 200 tonne mooring
bollards
• Quay 3 – 87 metres long with heavy lift pad (1,000 tonne capacity)
• Quay 4 (deep water berth) – 200 tonne mooring bollards
• Queens Dock – 150 metres long with 50 tonne and 200 tonne
mooring bollards
• 1,393.5 m
2
paint shop at the smelter facility
>