The UK Offshore Oil and Gas Fabricators Directory 2014 - page 65

page 65
THE UK OFFSHORE OIL AND GAS FABRICATORS DIRECTORY
2014
Projects and Markets
(continued)
Greater Gabbard Topsides
Client:
Siemens Energy
Contract:
Engineering, procurement and
construction (EPC)
Completion Date:
2009
Structure:
Offshore wind substation topside
Weight
Topside:
2,100 tonnes
Size (Length x Width x Height)
Topside:
39 x 31 x 18 metres
Expertise
Management of full EPC(I) contracts, design, engineering,
fabrication, transport, installation, hook-up and commissioning.
Fabrication Tonnage
(Last Three Years)
14,100 tonnes
Fabrication Revenue/Turnover
(Last Three Years)
Not Provided
Ability To Build Large Structures
Under Cover (Yes/No)
Yes
Current Market Areas
Oil and gas and energy-related industries
Potential Market Areas
Not Provided
>
1...,55,56,57,58,59,60,61,62,63,64 66,67,68,69,70,71,72,73,74,75,...98
Powered by FlippingBook