Table of Contents Table of Contents
Previous Page  104-105 / 1248 Next Page
Information
Show Menu
Previous Page 104-105 / 1248 Next Page
Page Background

Expected Gas Sourcing

Caspian Region, Norway, Russia, LNG (), Iraq, Iran, Egypt, Israel, Turkmenistan, Kazakhstan, Cyprus, Azerbaijan, Any gas available at Turkish/European HUBs. For dire

PCI Details

PCI Benefits

Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation

prior to the commissioning of the project, Project concerns investment in reverse flow capacity

General Criteria Fulfilled

Yes

Specific Criteria Fulfilled

Competition, Market Integration, Security of Supply, Sustainability

Specific Criteria Fulfilled Comments

Pipelines and Compressor Stations - Alternative Variant

Eastring - BG-1

High capacity scenario, starting at Negru-Voda IP at RO-BG

border, passing through BG using upgraded existing

pipelines to Malkoclar IP at BG-TR border

Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Eastring-BG-1

Length of used existing pipeline - 259 km

1,200

0

0

Total

0

0

Pipelines and Compressor Stations - Alternative Variant

Eastring - BG-3

Low capacity scenario (low in direction N->S), starting at

Negru-Voda IP at RO-BG border, passing through BG using

upgraded existing pipelines to Malkoclar IP at BG-TR border

Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Eastring-BG-3

Length of used existing pipeline - 259 km

1,200

0

0

Total

0

0

Pipelines and Compressor Stations - Alternative Variant

Eastring - BG-4

Low capacity scenario (low in direction N->S), starting at

new IP at RO-BG border, passing through BG using new

pipeline to new IP at BG-TR border

Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Eastring-BG-4

Data refers to the first stage - capacity 570 GWh/d, in case of

increase of capacity up to 1140 GWh/d in 2025, compressor

power at level of 374 MW will be needed

1,400

257

90

Total

257

90

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 52 of 620

Current TYNDP : TYNDP 2017 - Annex A