Expected Gas Sourcing
Caspian Region, Norway, Russia, LNG (), Iraq, Iran, Egypt, Israel, Turkmenistan, Kazakhstan, Cyprus, Azerbaijan, Any gas available at Turkish/European HUBs. For dire
PCI Details
PCI Benefits
Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation
prior to the commissioning of the project, Project concerns investment in reverse flow capacity
General Criteria Fulfilled
Yes
Specific Criteria Fulfilled
Competition, Market Integration, Security of Supply, Sustainability
Specific Criteria Fulfilled Comments
Pipelines and Compressor Stations - Alternative Variant
Eastring - BG-1
High capacity scenario, starting at Negru-Voda IP at RO-BG
border, passing through BG using upgraded existing
pipelines to Malkoclar IP at BG-TR border
Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Eastring-BG-1
Length of used existing pipeline - 259 km
1,200
0
0
Total
0
0
Pipelines and Compressor Stations - Alternative Variant
Eastring - BG-3
Low capacity scenario (low in direction N->S), starting at
Negru-Voda IP at RO-BG border, passing through BG using
upgraded existing pipelines to Malkoclar IP at BG-TR border
Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Eastring-BG-3
Length of used existing pipeline - 259 km
1,200
0
0
Total
0
0
Pipelines and Compressor Stations - Alternative Variant
Eastring - BG-4
Low capacity scenario (low in direction N->S), starting at
new IP at RO-BG border, passing through BG using new
pipeline to new IP at BG-TR border
Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Eastring-BG-4
Data refers to the first stage - capacity 570 GWh/d, in case of
increase of capacity up to 1140 GWh/d in 2025, compressor
power at level of 374 MW will be needed
1,400
257
90
Total
257
90
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 52 of 620
Current TYNDP : TYNDP 2017 - Annex A