Construction of a Looping CS Provadia ² Rupcha village

General Information

Promoter

Bulgartransgaz EAD

Operator

Bulgartransgaz EAD

Host Country

Bulgaria

Status

Planned

Website

Project's URL

Publication Approval Status

Approved

Sponsors

Provadia - Rupcha

Bulgartrasngaz EAD

100%

Strandja-IP BG/TR

Bulgartrasngaz EAD

100%

TRA-N-594

Project

Pipeline including CS

Non-FID

Update Date

27/05/2016

Non-Advanced

Description

Modernisation of the existing network for transit transmission with the construction of 50 km looping with prevailing diameter Dn 1200 from

Provadia to the village of Rupcha, replacement of 20 km Ȝ km) 12 of existing gas pipelines with diameter of Dn 1000 from CS Strandja to the

border with Turkey and increase in the capacity of CS Strandja with 10 MW. The realization of the project will ensure new capacity of 6 bcm/y (192,5

GWh/d) to Turkey.

Regulatory Decisions and

similar material conditions

Capacity Increments Variant For Modelling

Point

Operator

Year

From Gas System To Gas System Capacity

Strandzha (BG) / Malkoclar (TR)

Bulgartransgaz EAD

2022

BGg/BGT

TRe

192.5 GWh/d

Comment: a new looping

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 44 of 620

Current TYNDP : TYNDP 2017 - Annex A