Table of Contents Table of Contents
Previous Page  94-95 / 1248 Next Page
Information
Show Menu
Previous Page 94-95 / 1248 Next Page
Page Background

Eastring - Bulgaria

TRA-N-654

Project

Pipeline including CS

Non-FID

Update Date

31/05/2016

Non-Advanced

Description

3URMHFW 'HVFULSWLRQ (DVWULQJ 6. LV VXESURMHFW ORFDWHG LQ 6ORYDNLD 8NUDLQH DQG LV HVVHQWLDO SDUW RI WKH (DVWULQJ SURMHFW ZKLFK FRQQHFWV ,3 9HđNp

Kapušany at the SK-UA border, with a new entry IP at an external border of the EU on the territory of Bulgaria in the following routing options: î

from SK to RO î via UA, (exist. pipeline) î via HU, (new pipeline). î from RO to TR î Option A ² new pipeline passing production & storage area and

continuing to IP Isaccea and to BG/TR border by utilizing existing RO-BG transit assets î Option B ² new pipeline, passing 2 production & storage

areas and continuing to an external border of the EU on the territory of Bulgaria. The project would (i) secure supplies in case of RU disruption and

therefore it will increase gas SoS in the broader Central-South-East EU region, (ii) allow access to alternative gas sources for Central, Western &

Southern Europe and (iii) mean step towards EU single gas market.

Regulatory Decisions and

similar material conditions

Capacity Increments Variant For Modelling

Variant : Eastring - BG-2

High capacity scenario, starting at new IP at RO-BG border, passing through BG using new

pipeline to a new IP at BG-TR border

Point

Operator

Year

From Gas System To Gas System Capacity

Eastring BG Domestic Point

Bulgartransgaz EAD

2021

BGn

BG/EAR

200.0 GWh/d

Comment: Entry/Exit capacity at domestic points may go up to the level of 200 GWh/d if sum of

all Exit capacities from domestic system to adjacent networks (or vice versa) is able to reach this

level.

Bulgartransgaz EAD

2021

BG/EAR

BGn

200.0 GWh/d

Comment: Entry/Exit capacity at domestic points may go up to the level of 200 GWh/d if sum of

all Exit capacities from domestic system to adjacent networks (or vice versa) is able to reach this

level.

Eastring Cross-Border BG/EAR <> RO/EAR

Bulgartransgaz EAD

2021

BG/EAR

RO/EAR

570.0 GWh/d

Comment: New interconnection point, New capacity increment from 4Q 2025 to the level of

1140 GWh/d.

Bulgartransgaz EAD

2021

RO/EAR

BG/EAR

570.0 GWh/d

Comment: New interconnection point, New capacity increment from 4Q 2025 to the level of

1140 GWh/d.

Bulgartransgaz EAD

2025

BG/EAR

RO/EAR

570.0 GWh/d

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 47 of 620

Current TYNDP : TYNDP 2017 - Annex A