EU |
2-3 |
AT |
2-3 |
Bidirectional Austrian-Czech Interconnector (BACI, formerly LBL project) |
2-3 |
GCA 2015/08: Entry/Exit Murfeld |
8-9 |
GCA Mosonmagyaróvár |
12-13 |
Břeclav-Baumgarten Interconnection (BBI) AT |
16-17 |
TAG Reverse Flow |
20-21 |
BE |
24-25 |
Zeebrugge LNG Terminal - 5th Tank & 2nd Jetty |
24-25 |
L/H Conversion |
28-29 |
Zeebrugge LNG Terminal - 3rd Jetty |
32-33 |
BG |
36-37 |
Interconnection Bulgaria - Serbia |
36-37 |
UGS Chiren Expansion |
42-43 |
Interconnection Turkey-Bulgaria |
48-49 |
Construction of new gas storage facility on the territory of Bulgaria |
54-55 |
Rehabilitation, Modernization and Expansion of the NTS |
58-59 |
Interconnector Greece-Bulgaria (IGB Project) |
64-65 |
A project for the construction of a gas pipeline BG-RO |
70-71 |
Looping CS Valchi Dol - Line valve Novi Iskar |
76-77 |
Varna-Oryahovo gas pipeline |
82-83 |
Construction of a Looping CS Provadia – Rupcha village |
88-89 |
Eastring - Bulgaria |
94-95 |
CY |
108-109 |
Cyprus Gas2EU |
108-109 |
CZ |
112-113 |
Bidirectional Austrian Czech Interconnection (BACI) |
112-113 |
Connection to Oberkappel |
118-119 |
Poland-Czech Republic Interconnection (CZ) |
124-125 |
Capacity4Gas (C4G) – DE/CZ |
130-131 |
Capacity4Gas (C4G) – CZ/SK |
134-135 |
Capacity4Gas (C4G) – CZ/AT |
138-139 |
DE |
142-143 |
Reverse Flow TENP Germany |
142-143 |
MONACO section phase I (Burghausen-Finsing) |
146-147 |
NOWAL - Nord West Anbindungsleitung |
152-153 |
ZEELINK |
158-159 |
CS Rothenstadt |
162-163 |
VDS Wertingen |
166-167 |
Pipeline project "Schwandorf-Finsing" |
170-171 |
Compressor station "Herbstein" |
174-175 |
Compressor station "Werne" |
178-179 |
West to East operation of the IP Waidhaus |
182-183 |
CS Rimpar |
186-187 |
EUGAL - Europaeische Gasanbindungsleitung (European Gaslink) |
190-191 |
Extension Receiving Terminal Greifswald |
196-197 |
Expansion NEL |
200-201 |
Transport of gas volumes to the Netherlands |
204-205 |
Additional East-West transport NL |
208-209 |
Upgrade IP Deutschneudorf and Lasow |
212-213 |
Compressor station "Legden" |
216-217 |
Nord Stream 2 |
220-221 |
Oude(NL)-Bunde(DE) GTG H-Gas |
224-225 |
Embedding CS Folmhusen in H-Gas |
228-229 |
GUD: Complete conversion to H-gas |
232-233 |
DK |
236-237 |
Gassled - Danish upstream system |
236-237 |
(Mirror) Baltic Pipe |
242-243 |
Nybro-Interconnector PL-DK - reinforcement |
248-249 |
EE |
252-253 |
Paldiski LNG Terminal |
252-253 |
Balticconnector |
258-259 |
Enhancement of Estonia-Latvia interconnection |
264-265 |
Tallinn LNG |
270-271 |
ES |
276-277 |
Underground Gas Storage in salt leached caverns in the Bages area (ES) |
276-277 |
South Transit East Pyrenees (STEP) - ENAGAS |
282-283 |
Gran Canaria 2º LNG Tank |
288-289 |
Gran Canaria LNG Terminal |
292-293 |
Gran Canaria send out increase |
296-297 |
Interconnection ES-PT (3rd IP) - 1st phase |
300-301 |
Musel LNG terminal |
306-307 |
Tenerife LNG Terminal |
310-311 |
Tenerife 2º LNG Storage Tank |
314-315 |
Tenerife Send-Out increase |
318-319 |
Mugardos LNG Terminal: Send-out Increase |
322-323 |
Mugardos LNG Terminal: 2nd Jetty |
328-329 |
Mugardos LNG Terminal: Storage Extension |
332-333 |
Iberian‐French corridor: Eastern Axis ‐ Midcat Project |
336-337 |
Interconnection ES-PT (3rd IP) - 2nd phase |
342-343 |
Guitiriz - Zamora pipeline |
348-349 |
FI |
354-355 |
Balticconnector Finnish part |
354-355 |
FR |
362-363 |
Val de Saône project |
362-363 |
Reverse capacity from CH to FR at Oltingue |
368-369 |
Reverse capacity from France to Germany at Obergailbach |
372-373 |
Montoir LNG Terminal Expansion |
378-379 |
Fos Cavaou LNG Terminal Expansion |
384-385 |
South Transit East Pyrenees (STEP) - TIGF |
390-391 |
Iberian-French corridor: Eastern Axis-Midcat Project |
396-397 |
Developments for Montoir LNG terminal 2.5 bcm expansion |
402-403 |
Developments for Fosmax (Cavaou) LNG 8.25 bcm expansion |
408-409 |
Gascogne Midi |
414-415 |
Adaptation L- gas - H-gas |
418-419 |
GR |
424-425 |
Poseidon Pipeline |
424-425 |
Komotini-Thesprotia pipeline |
432-433 |
Trans Adriatic Pipeline |
444-445 |
LNG terminal in northern Greece / Alexandroupolis - LNG Section |
452-453 |
LNG terminal in northern Greece / Alexandroupolis - Pipeline Section |
460-461 |
Compressor Station Kipi |
468-469 |
Revythoussa (2nd upgrade) |
474-475 |
EastMed Pipeline |
478-479 |
South Kavala Underground Gas Storage facility |
486-487 |
Greek part of Tesla project |
492-493 |
Metering and Regulating station at Komotini |
498-499 |
Metering and Regulating station at Nea Messimvria |
502-503 |
Metering Station at Komotini to IGB |
506-507 |
Nea-Messimvria to FYROM pipeline |
510-511 |
Compressor station at Nea Messimvria |
516-517 |
Metering and Regulating Station at Alexandroupoli |
522-523 |
Metering and Regulating station at Megalopoli |
526-527 |
Metering and Regulating Station at UGS South Kavala |
532-533 |
HR |
536-537 |
Interconnection Croatia -Bosnia and Herzegovina (Slobodnica- Bosanski Brod) |
536-537 |
Ionian Adriatic Pipeline |
542-543 |
Interconnection Croatia/Serbia (Slobdnica-Sotin-Bačko Novo Selo) |
550-551 |
LNG evacuation pipeline Zlobin-Bosiljevo-Sisak-Kozarac |
556-557 |
LNG terminal Krk |
562-563 |
Interconnection Croatia/Slovenia (Lučko - Zabok - Rogatec) |
572-573 |
LNG evacuation pipeline Omišalj - Zlobin (Croatia) |
578-579 |
Interconnection Croatia-Bosnia and Herzegovina (South) |
584-585 |
Interconnection Croatia-Bosnia and Herzegovina (west) |
590-591 |
Compressor station 1 at the Croatian gas transmission system |
596-597 |
Interconnection Croatia/Slovenia (Umag-Koper) |
600-601 |
Compressor stations 2 and 3 at the Croatian gas tranmission system |
604-605 |
LNG Evacuation Pipeline Kozarac-Slobodnica |
610-611 |
HU |
616-617 |
Városföld-Ercsi-Győr |
616-617 |
Ercsi-Szazhalombatta |
622-623 |
Hajduszoboszlo CS |
628-629 |
Városföld CS |
632-633 |
Romanian-Hungarian reverse flow Hungarian section 1st stage |
638-639 |
Slovenian-Hungarian interconnector |
644-645 |
Romanian-Hungarian reverse flow Hungarian section 2nd stage |
650-651 |
BG-RO-HU-AT transmission corridor |
656-657 |
Enhancement of Transmission Capacity of Slovak-Hungarian interconnector |
662-663 |
Hungarian section of Tesla project |
668-669 |
HU-UA reverse flow |
674-675 |
Development of Transmission Capacity at Slovak-Hungarian interconnector |
678-679 |
Eastring - Hungary |
684-685 |
Vecsés-Városföld gas transit pipeline |
690-691 |
IE |
696-697 |
Shannon LNG Terminal and Connecting Pipeline |
696-697 |
Physical Reverse Flow on South North Pipeline |
702-703 |
IT |
706-707 |
Development for new import from the South (Adriatica Line) |
706-707 |
Import developments from North-East |
710-711 |
Additional Southern developments |
714-715 |
GALSI Pipeline Project |
718-719 |
Porto Empedocle LNG |
726-727 |
Support to the North West market and bidirectional cross-border flows |
732-733 |
Onshore LNG terminal in the Northern Adriatic |
738-739 |
Nuovi Sviluppi Edison Stoccaggio |
744-745 |
Palazzo Moroni |
750-751 |
Bordolano first phase |
756-757 |
System Enhancements - Stogit - on-shore gas fields |
760-761 |
Interconnection with Slovenia |
764-765 |
LARINO - RECANATI Adriatic coast backbone |
768-769 |
Sardinia Gas Transportation Network |
774-775 |
Bordolano Second phase |
778-779 |
LT |
782-783 |
Syderiai |
782-783 |
Gas Interconnection Poland-Lithuania (GIPL) (Lithuania's section) |
788-789 |
Enhancement of Latvia-Lithuania interconnection (Lithuania's part) |
794-795 |
LNG Terminal in Klaipeda |
798-799 |
LV |
804-805 |
Enhancement of Incukalns UGS |
804-805 |
Enhancement of Latvia-Lithuania interconnection (Latvian part) |
810-811 |
Skulte LNG |
816-817 |
MT |
820-821 |
Connection of Malta to the European Gas Network - Pipelines |
820-821 |
Connection of Malta to the European Gas Network - LNG Regasification |
826-827 |
NL |
832-833 |
Gate terminal phase 3 |
832-833 |
Blending |
838-839 |
Entry capacity expansion GATE terminal |
842-843 |
Capacity expansion OSZ related to West Stream |
846-847 |
H-gas conversion of L-gas export border points |
850-851 |
PL |
854-855 |
Gas Interconnection Poland-Lithuania (GIPL) - PL section |
854-855 |
North - South Gas Corridor in Eastern Poland |
860-861 |
North - South Gas Corridor in Western Poland |
866-867 |
Poland - Denmark interconnection (Baltic Pipe) - PL section |
872-873 |
Upgrade of LNG terminal in Świnoujście |
878-879 |
Poland - Czech Republic interconnection (PL section) |
884-885 |
Poland - Slovakia interconnection (PL section) |
890-891 |
Poland - Ukraine Gas interconnection (PL section) |
896-897 |
UGS Damaslawek |
902-903 |
FSRU Polish Baltic Sea Coast |
906-907 |
PT |
912-913 |
3rd IP between Portugal and Spain (pipeline Celorico-Spanish border) |
912-913 |
3rd IP between Portugal and Spain (Compressor Station) |
918-919 |
3rd IP between Portugal and Spain (pipeline Cantanhede-Mangualde) |
924-925 |
Carregado Compressor Station |
930-931 |
RENC-8 Carriço UGS cavern |
936-937 |
RO |
940-941 |
Romania-Bulgaria Interconnection (EEPR-2009-INTg-RO-BG) |
940-941 |
White Stream |
944-945 |
Interconnection of the NTS with the DTS and reverse flow at Isaccea |
950-951 |
Depomures |
956-957 |
NTS developments in North-East Romania |
962-963 |
Development on the Romanian territory of the NTS (BG–RO-HU-AT Corridor) |
966-967 |
Development on the Romanian territory of the Southern Transmission Corridor |
972-973 |
New undergound gas storage in Romania |
978-979 |
Sarmasel undeground gas storage in Romania |
984-985 |
Azerbaijan, Georgia, Romania Interconnector - AGRI |
990-991 |
Eastring - Romania |
996-997 |
Further enlargement of the BG—RO—HU—AT transmission corridor (BRUA) phase 3 |
1000-1001 |
New NTS developments for taking over gas from the Black Sea shore |
1006-1007 |
SE |
1010-1011 |
Project GO4LNG LNG terminal Gothenburg |
1010-1011 |
SI |
1016-1017 |
CS Ajdovščina, 1st phase of upgrade |
1016-1017 |
CS Ajdovščina, 2nd phase of upgrade |
1020-1021 |
CS Kidričevo, 2nd phase of upgrade |
1024-1025 |
M3/1a Šempeter - Ajdovščina |
1028-1029 |
M8 Kalce - Jelšane |
1032-1033 |
M6 Interconnection Osp |
1036-1037 |
M3 pipeline reconstruction from CS Ajdovščina to Šempeter/Gorizia |
1040-1041 |
R15/1 Pince - Lendava - Kidričevo |
1044-1045 |
R61 Dragonja - Izola |
1050-1051 |
M3/1c Kalce - Vodice |
1054-1055 |
M3/1b Ajdovščina - Kalce |
1058-1059 |
M6 Ajdovščina – Lucija |
1062-1063 |
Upgrade of Murfeld/Ceršak interconnection (M1/3 Interconnection Ceršak) |
1066-1067 |
Upgrade of Rogatec interconnection (M1A/1 Interconnection Rogatec) |
1070-1071 |
SK |
1074-1075 |
System Enhancements - Eustream |
1074-1075 |
Poland - Slovakia interconnection |
1078-1079 |
Eastring - Slovakia |
1084-1085 |
Capacity increase at IP Lanžhot entry |
1094-1095 |
Exit Capacity Budince |
1100-1101 |
UK |
1104-1105 |
Industrial Emissions Directive (IPPC) - FID |
1104-1105 |
Physical reverse flow from NI to GB and IE via SNIP pipeline |
1108-1109 |
Preesall Gas Storage |
1114-1115 |
Islandmagee Gas Storage Facility |
1118-1119 |
Industrial Emissions Directive (LCP) |
1124-1125 |
Industrial Emisssion Directive (IPPC) - Non-FID |
1128-1129 |
Gas to the West |
1132-1133 |
PCI 5.1.1 Physical Reverse Flow at Moffat interconnection point (IE/UK) |
1136-1137 |
Moffat Physical Reverse Flow |
1142-1143 |
Non-EU |
1144-1145 |
AL |
1144-1145 |
Eagle LNG and Pipeline |
1144-1145 |
Albania - Kosovo Gas Pipeline |
1154-1155 |
AZ |
1160-1161 |
South Caucasus Pipeline Future Expansion - SCPFX |
1160-1161 |
BA |
1166-1167 |
Gaspipeline Brod - Zenica |
1166-1167 |
Southern Interconnection pipeline BiH/CRO |
1172-1173 |
Western interconnection BiH/CRO |
1178-1179 |
CH |
1184-1185 |
Reverse Flow Transitgas Switzerland |
1184-1185 |
MK |
1188-1189 |
Infrastructure gas pipeline Skopje - Tetovo - Gostivar - Albanian border |
1188-1189 |
Macedonian part of Tesla project |
1192-1193 |
Interconnection Macedonia-Serbia |
1196-1197 |
Interconnection Macedonia-Kosovo |
1202-1203 |
Interconnection Macedonia-Bulgaria |
1208-1209 |
Interconnection Macedonia-Greece |
1214-1215 |
Interconnection Macedonia-Albania |
1220-1221 |
TM |
1226-1227 |
Trans-Caspian |
1226-1227 |
TR |
1232-1233 |
TANAP - Trans Anatolian Natural Gas Pipeline Project |
1232-1233 |
UA |
1238-1239 |
Poland-Ukraine Interconnector (Ukrainian section) |
1238-1239 |
HU-UA Interconnector (Ukrainian section) |
1244-1245 |