Table of Contents Table of Contents
TYNDP 2017 - Annex A2 - Project Details Next Page
Information
Show Menu
TYNDP 2017 - Annex A2 - Project Details Next Page

 




EU
2-3

AT
2-3

Bidirectional Austrian-Czech Interconnector (BACI, formerly LBL project)
2-3

GCA 2015/08: Entry/Exit Murfeld
8-9

GCA Mosonmagyaróvár
12-13

Břeclav-Baumgarten Interconnection (BBI) AT
16-17

TAG Reverse Flow
20-21

BE
24-25

Zeebrugge LNG Terminal - 5th Tank & 2nd Jetty
24-25

L/H Conversion
28-29

Zeebrugge LNG Terminal - 3rd Jetty
32-33

BG
36-37

Interconnection Bulgaria - Serbia
36-37

UGS Chiren Expansion
42-43

Interconnection Turkey-Bulgaria
48-49

Construction of new gas storage facility on the territory of Bulgaria
54-55

Rehabilitation, Modernization and Expansion of the NTS
58-59

Interconnector Greece-Bulgaria (IGB Project)
64-65

​A project for the construction of a gas pipeline BG-RO
70-71

Looping CS Valchi Dol - Line valve Novi Iskar
76-77

Varna-Oryahovo gas pipeline
82-83

Construction of a Looping CS Provadia – Rupcha village
88-89

Eastring - Bulgaria
94-95

CY
108-109

Cyprus Gas2EU
108-109

CZ
112-113

Bidirectional Austrian Czech Interconnection (BACI)
112-113

Connection to Oberkappel
118-119

Poland-Czech Republic Interconnection (CZ)
124-125

Capacity4Gas (C4G) – DE/CZ
130-131

Capacity4Gas (C4G) – CZ/SK
134-135

Capacity4Gas (C4G) – CZ/AT
138-139

DE
142-143

Reverse Flow TENP Germany
142-143

MONACO section phase I (Burghausen-Finsing)
146-147

NOWAL - Nord West Anbindungsleitung
152-153

ZEELINK
158-159

CS Rothenstadt
162-163

VDS Wertingen
166-167

Pipeline project "Schwandorf-Finsing"
170-171

Compressor station "Herbstein"
174-175

Compressor station "Werne"
178-179

West to East operation of the IP Waidhaus
182-183

CS Rimpar
186-187

EUGAL - Europaeische Gasanbindungsleitung (European Gaslink)
190-191

Extension Receiving Terminal Greifswald
196-197

Expansion NEL
200-201

Transport of gas volumes to the Netherlands
204-205

Additional East-West transport NL
208-209

Upgrade IP Deutschneudorf and Lasow
212-213

Compressor station "Legden"
216-217

Nord Stream 2
220-221

Oude(NL)-Bunde(DE) GTG H-Gas
224-225

Embedding CS Folmhusen in H-Gas
228-229

GUD: Complete conversion to H-gas
232-233

DK
236-237

Gassled - Danish upstream system
236-237

(Mirror) Baltic Pipe
242-243

Nybro-Interconnector PL-DK - reinforcement
248-249

EE
252-253

Paldiski LNG Terminal
252-253

Balticconnector
258-259

Enhancement of Estonia-Latvia interconnection
264-265

Tallinn LNG
270-271

ES
276-277

Underground Gas Storage in salt leached caverns in the Bages area (ES)
276-277

South Transit East Pyrenees (STEP) - ENAGAS
282-283

Gran Canaria 2º LNG Tank
288-289

Gran Canaria LNG Terminal
292-293

Gran Canaria send out increase
296-297

Interconnection ES-PT (3rd IP) - 1st phase
300-301

Musel LNG terminal
306-307

Tenerife LNG Terminal
310-311

Tenerife 2º LNG Storage Tank
314-315

Tenerife Send-Out increase
318-319

Mugardos LNG Terminal: Send-out Increase
322-323

Mugardos LNG Terminal: 2nd Jetty
328-329

Mugardos LNG Terminal: Storage Extension
332-333

Iberian‐French corridor: Eastern Axis ‐ Midcat Project
336-337

Interconnection ES-PT (3rd IP) - 2nd phase
342-343

Guitiriz - Zamora pipeline
348-349

FI
354-355

Balticconnector Finnish part
354-355

FR
362-363

Val de Saône project
362-363

Reverse capacity from CH to FR at Oltingue
368-369

Reverse capacity from France to Germany at Obergailbach
372-373

Montoir LNG Terminal Expansion
378-379

Fos Cavaou LNG Terminal Expansion
384-385

South Transit East Pyrenees (STEP) - TIGF
390-391

Iberian-French corridor: Eastern Axis-Midcat Project
396-397

Developments for Montoir LNG terminal 2.5 bcm expansion
402-403

Developments for Fosmax (Cavaou) LNG 8.25 bcm expansion
408-409

Gascogne Midi
414-415

Adaptation L- gas - H-gas
418-419

GR
424-425

Poseidon Pipeline
424-425

Komotini-Thesprotia pipeline
432-433

Trans Adriatic Pipeline
444-445

LNG terminal in northern Greece / Alexandroupolis - LNG Section
452-453

LNG terminal in northern Greece / Alexandroupolis - Pipeline Section
460-461

Compressor Station Kipi
468-469

Revythoussa (2nd upgrade)
474-475

EastMed Pipeline
478-479

South Kavala Underground Gas Storage facility
486-487

Greek part of Tesla project
492-493

Metering and Regulating station at Komotini
498-499

Metering and Regulating station at Nea Messimvria
502-503

Metering Station at Komotini to IGB
506-507

Nea-Messimvria to FYROM pipeline
510-511

Compressor station at Nea Messimvria
516-517

Metering and Regulating Station at Alexandroupoli
522-523

Metering and Regulating station at Megalopoli
526-527

Metering and Regulating Station at UGS South Kavala
532-533

HR
536-537

Interconnection Croatia -Bosnia and Herzegovina (Slobodnica- Bosanski Brod)
536-537

Ionian Adriatic Pipeline
542-543

Interconnection Croatia/Serbia (Slobdnica-Sotin-Bačko Novo Selo)
550-551

LNG evacuation pipeline Zlobin-Bosiljevo-Sisak-Kozarac
556-557

LNG terminal Krk
562-563

Interconnection Croatia/Slovenia (Lučko - Zabok - Rogatec)
572-573

LNG evacuation pipeline Omišalj - Zlobin (Croatia)
578-579

Interconnection Croatia-Bosnia and Herzegovina (South)
584-585

Interconnection Croatia-Bosnia and Herzegovina (west)
590-591

Compressor station 1 at the Croatian gas transmission system
596-597

Interconnection Croatia/Slovenia (Umag-Koper)
600-601

Compressor stations 2 and 3 at the Croatian gas tranmission system
604-605

LNG Evacuation Pipeline Kozarac-Slobodnica
610-611

HU
616-617

Városföld-Ercsi-Győr
616-617

Ercsi-Szazhalombatta
622-623

Hajduszoboszlo CS
628-629

Városföld CS
632-633

Romanian-Hungarian reverse flow Hungarian section 1st stage
638-639

Slovenian-Hungarian interconnector
644-645

Romanian-Hungarian reverse flow Hungarian section 2nd stage
650-651

BG-RO-HU-AT transmission corridor
656-657

Enhancement of Transmission Capacity of Slovak-Hungarian interconnector
662-663

Hungarian section of Tesla project
668-669

HU-UA reverse flow
674-675

Development of Transmission Capacity at Slovak-Hungarian interconnector
678-679

Eastring - Hungary
684-685

Vecsés-Városföld gas transit pipeline
690-691

IE
696-697

Shannon LNG Terminal and Connecting Pipeline
696-697

Physical Reverse Flow on South North Pipeline
702-703

IT
706-707

Development for new import from the South (Adriatica Line)
706-707

Import developments from North-East
710-711

Additional Southern developments
714-715

GALSI Pipeline Project
718-719

Porto Empedocle LNG
726-727

Support to the North West market and bidirectional cross-border flows
732-733

Onshore LNG terminal in the Northern Adriatic
738-739

Nuovi Sviluppi Edison Stoccaggio
744-745

Palazzo Moroni
750-751

Bordolano first phase
756-757

System Enhancements - Stogit - on-shore gas fields
760-761

Interconnection with Slovenia
764-765

LARINO - RECANATI Adriatic coast backbone
768-769

Sardinia Gas Transportation Network
774-775

Bordolano Second phase
778-779

LT
782-783

Syderiai
782-783

Gas Interconnection Poland-Lithuania (GIPL) (Lithuania's section)
788-789

Enhancement of Latvia-Lithuania interconnection (Lithuania's part)
794-795

LNG Terminal in Klaipeda
798-799

LV
804-805

Enhancement of Incukalns UGS
804-805

Enhancement of Latvia-Lithuania interconnection (Latvian part)
810-811

Skulte LNG
816-817

MT
820-821

Connection of Malta to the European Gas Network - Pipelines
820-821

Connection of Malta to the European Gas Network - LNG Regasification
826-827

NL
832-833

Gate terminal phase 3
832-833

Blending
838-839

Entry capacity expansion GATE terminal
842-843

Capacity expansion OSZ related to West Stream
846-847

H-gas conversion of L-gas export border points
850-851

PL
854-855

Gas Interconnection Poland-Lithuania (GIPL) - PL section
854-855

North - South Gas Corridor in Eastern Poland
860-861

North - South Gas Corridor in Western Poland
866-867

Poland - Denmark interconnection (Baltic Pipe) - PL section
872-873

Upgrade of LNG terminal in Świnoujście
878-879

Poland - Czech Republic interconnection (PL section)
884-885

Poland - Slovakia interconnection (PL section)
890-891

Poland - Ukraine Gas interconnection (PL section)
896-897

UGS Damaslawek
902-903

FSRU Polish Baltic Sea Coast
906-907

PT
912-913

3rd IP between Portugal and Spain (pipeline Celorico-Spanish border)
912-913

3rd IP between Portugal and Spain (Compressor Station)
918-919

3rd IP between Portugal and Spain (pipeline Cantanhede-Mangualde)
924-925

Carregado Compressor Station
930-931

RENC-8 Carriço UGS cavern
936-937

RO
940-941

Romania-Bulgaria Interconnection (EEPR-2009-INTg-RO-BG)
940-941

White Stream
944-945

Interconnection of the NTS with the DTS and reverse flow at Isaccea
950-951

Depomures
956-957

NTS developments in North-East Romania
962-963

Development on the Romanian territory of the NTS (BG–RO-HU-AT Corridor)
966-967

Development on the Romanian territory of the Southern Transmission Corridor
972-973

New undergound gas storage in Romania
978-979

Sarmasel undeground gas storage in Romania
984-985

Azerbaijan, Georgia, Romania Interconnector - AGRI
990-991

Eastring - Romania
996-997

Further enlargement of the BG—RO—HU—AT transmission corridor (BRUA) phase 3
1000-1001

New NTS developments for taking over gas from the Black Sea shore
1006-1007

SE
1010-1011

Project GO4LNG LNG terminal Gothenburg
1010-1011

SI
1016-1017

CS Ajdovščina, 1st phase of upgrade
1016-1017

CS Ajdovščina, 2nd phase of upgrade
1020-1021

CS Kidričevo, 2nd phase of upgrade
1024-1025

M3/1a Šempeter - Ajdovščina
1028-1029

M8 Kalce - Jelšane
1032-1033

M6 Interconnection Osp
1036-1037

M3 pipeline reconstruction from CS Ajdovščina to Šempeter/Gorizia
1040-1041

R15/1 Pince - Lendava - Kidričevo
1044-1045

R61 Dragonja - Izola
1050-1051

M3/1c Kalce - Vodice
1054-1055

M3/1b Ajdovščina - Kalce
1058-1059

M6 Ajdovščina – Lucija
1062-1063

Upgrade of Murfeld/Ceršak interconnection (M1/3 Interconnection Ceršak)
1066-1067

Upgrade of Rogatec interconnection (M1A/1 Interconnection Rogatec)
1070-1071

SK
1074-1075

System Enhancements - Eustream
1074-1075

Poland - Slovakia interconnection
1078-1079

Eastring - Slovakia
1084-1085

Capacity increase at IP Lanžhot entry
1094-1095

Exit Capacity Budince
1100-1101

UK
1104-1105

Industrial Emissions Directive (IPPC) - FID
1104-1105

Physical reverse flow from NI to GB and IE via SNIP pipeline
1108-1109

Preesall Gas Storage
1114-1115

Islandmagee Gas Storage Facility
1118-1119

Industrial Emissions Directive (LCP)
1124-1125

Industrial Emisssion Directive (IPPC) - Non-FID
1128-1129

Gas to the West
1132-1133

PCI 5.1.1 Physical Reverse Flow at Moffat interconnection point (IE/UK)
1136-1137

Moffat Physical Reverse Flow
1142-1143

Non-EU
1144-1145

AL
1144-1145

Eagle LNG and Pipeline
1144-1145

Albania - Kosovo Gas Pipeline
1154-1155

AZ
1160-1161

South Caucasus Pipeline Future Expansion - SCPFX
1160-1161

BA
1166-1167

Gaspipeline Brod - Zenica
1166-1167

Southern Interconnection pipeline BiH/CRO
1172-1173

Western interconnection BiH/CRO
1178-1179

CH
1184-1185

Reverse Flow Transitgas Switzerland
1184-1185

MK
1188-1189

Infrastructure gas pipeline Skopje - Tetovo - Gostivar - Albanian border
1188-1189

Macedonian part of Tesla project
1192-1193

Interconnection Macedonia-Serbia
1196-1197

Interconnection Macedonia-Kosovo
1202-1203

Interconnection Macedonia-Bulgaria
1208-1209

Interconnection Macedonia-Greece
1214-1215

Interconnection Macedonia-Albania
1220-1221

TM
1226-1227

Trans-Caspian
1226-1227

TR
1232-1233

TANAP - Trans Anatolian Natural Gas Pipeline Project
1232-1233

UA
1238-1239

Poland-Ukraine Interconnector (Ukrainian section)
1238-1239

HU-UA Interconnector (Ukrainian section)
1244-1245