ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Annex B: Infrastructure Projects - page 4

Modelled Direction
Yes
entry
Security of Supply, Market integration (BG- RO), Reverse Flows, Diversification of sources, Diversification of routes, N-1 National (GR), N-1 Regional (BG- RO), The LNG Terminal at Revythoussa plays significant role regarding the Security
of Supply of gas in Greece and contributes to the stable operation of NNGS. The project will enhance the above attitudes along with its flexibility for serving more shippers. It will also increase the storage capacity of the terminal. Both
above benefits will also be felt by BG and RO through the reverse flow arrangements or new North-South interconnections
.
DESCRIPTION OF THE PROJECT
EXPECTED BENEFITS
PROJECTED CAPACITY INCREASES
Hub Greece
Greek State and EU funds (NSRF 2007-2013)
Loan application submitted to EIB in July 2013
Public financing
Private financing
Multilateral financing
COMMENTS ABOUT THE PROJECT FINANCING
Interconnection
Capacity (GWh/d)
From Zone
To Zone
LNG Terminals Greece
67.40
Revythoussa
The projects consists of:
- the upgrading of the send-out capacity from 1,000 to 1,400 m3/h (from 14.14 to 19.82 Nm3/d)
- the upgrading of the storage capacity from 130,000 m3 to 225,000 m3 with the addition of a 3rd tank
- the increase of maximum ship size from 140,000 to 260,000 m3
ENTSOG TYNDP 2013-2013 - Annex A
Southern Corridor GRIP 2014–2023 Annex B |
4