ENTSOG MAPS

In 2014, ENTSOG continued publication of the popular

Transmission Capacity Map 2014 and System Development

Map 2013, performing the latter in collaboration with GIE.

Both maps benefited from ENTSOG commitment to continu-

ously improving on deliverables. The

Transmission Capacity

Map

provides an overview of Europe’s main high-pressure

transmission lines with information on the technical capaci-

ties at cross-border interconnection points. The 2014 edition

was printed in June. The

System Development Map

pro-

duced in collaboration with Gas Infrastructure Europe focus-

es on the supply and demand trend of the previous year. It

also provides an overview of the existing gas infrastructure

and an outlook for its development. The 2014 edition – cover-

ing the year 2013 – was published in November.

The current edition of maps can be ordered online:

http://maps.entsog.eu

SUPPORT FOR GAS REGIONAL

INVESTMENT PLANS

Regional cooperation between TSOs is essential in the gas

industry since most of the consumed gas travels across

Europe from non-EU supply sources. For this purpose, Gas

Regional Investment Plans (GRIPs) are developed by mem-

ber TSOs under the umbrella of ENTSOG. These help to

coordinate activities between neighbouring TSOs and

provide financial support for further infrastructural develop-

ments wherever necessary. GRIPs serve as a link between

TYNDP and national plans.

Publication of the second edition of the GRIP reports com-

menced in November 2013 with the North-Western region

and was completed in August 2014 with the South-North cor-

ridor. During this process, ENTSOG supported TSOs through

its modelling expertise. Compared to the first edition, each re-

gion has contributed with new content based on the feedback

received. Regional cooperation within ENTSOG also means

that reports further converged in terms of content and layout.

30 |

ENTSOG Annual Report 2014