ENTSOG GRIP CEE 2014-2023 / Annex B : Infrastructure Projects - page 11

SPONSORS
GENERAL INFORMATION
FINANCING
THIRD-PARTY ACCESS REGIME
SCHEDULE
TECHNICAL INFORMATION
Project of Common Interest
Yes
Interconnection Turkey-Bulgaria
Bulgartransgaz EAD
Bulgartransgaz EAD
Pipeline including CS
Interested by PCI ?
IGAs
Web Link
TRA-N-140
Non-FID
Promoter
Operator
TEN-E Project ?
2
Not relevant
0%
Not relevant
Planned
0%
FID
Construction
Commissioning
Last completed Phase :
# of Pipelines, nodes, CS
Total Pipeline Length (km)
2
+205,00
Applied for Exemption ?
Exemption granted ?
% Exemption in entry direction
% Exemption in exit direction
Total CS Power (MW)
Expected Load Factor
End of permitting phase
2016
Considered TPA Regime
Considered Tariff Regime
Not applicable
Not applicable
Bulgartransgaz EAD
for the gas pipeline
section on the
territory of Bulgaria
(100%)
GRIP Central Eastern Europe 2014–2023 Annex B
| 11
BULGARIA