ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Annex A: Country-TSO Profiles - page 4

4 | Southern Corridor GRIP 2014–2023 Annex A
KAVARNA
DO
DO
ANA
LUCEAFARUL
GALATA
KALIAKRA
Constanţa
Varna
Kozloduy
Ruse
Giurgiu
aječar
Dimitrovgrad
WHITE STREAM
(option 1)
W
(op
SOUTH STREAM
TR
South Stream
Stream
South
IGB
ITB
IBR
Mehedinti
š
Silistra
Dobrich
Oryahovo
Pleven
Burgas
Tekirdag
Kirklareli
Edirne
Istanbul
Kilkis
Drama
Kavala
Xanthi
StaraZagora
Ihtiman
Komotini
Alexandroupoulis
Horezu
Dupnitsa
B U L G A R I A
SOFIA
BUCHAREST
Ki i
Sidirokastron
Kulata
Marmara
Ereglisi
Petrich
ilovo Kyustendil
Srtandszha
Malkoclar
NegruVoda
Kardam
51
50
53
64
52
124
222
Existing Gas Infrastructure
NUMBER OF TSOS
1
TOTAL LENGTH OF TRANSMISSION NETWORK(S)
2,645 km
TOTAL COMPRESSOR POWER
Transmission: 263 MW
Storage: 10 MW
Inter-TSO connections where capacity is marketed (including upstream operators)
BULGARTRANSGAZ
– Negru Voda 1 (Transgaz RO / Kardam (BG)
– Negru Voda 2,3 (Transgaz RO) / Kardam (BG)
– Kulata (BG) / Sidirokastron (DESFA GR)
– Srtandzha (BG) / Malkoclar (BOTAŞ TR)
– Kyustendil (BG) / Zidilovo (GA-MA MK)
LNG terminals
N / A
Storage facilities
The underground gas storage facility, which is owned and operated by
Bulgartransgaz is connected to Bulgartransgaz network
UGS Chiren
Production facilities
Production facilities in Bulgaria are connected to Bulgartransgaz network in the
following entry points:
– GMS Provadia
– GRS Pleven
Directly connected customers
BULGARTRANSGAZ
– Total: 262
– Gas-fired power plants: 0
TSO connections to Distribution Systems and total number of DSOs in the country
BULGARTRANSGAZ
– Number of physical TS-DS connections: 65
– Number of DSOs: 17
PHYSICAL HUBS AND VIRTUAL TRADING POINTS
N / A
NUMBER OF BALANCING ZONES
1
Bulgaria
1,2,3 5,6,7,8,9,10,11,12,13,14,...22