Břeclav-Baumgarten Interconnection (BBI) AT
General Information
Promoter
GAS CONNECT AUSTRIA
GmbH
Operator
Gas Connect Austria GmbH
Host Country
Austria
Status
Planned
Website
Publication Approval Status
Approved
Sponsors
TRA-N-801
Project
Pipeline including CS
Non-FID
Update Date
04/05/2016
Advanced
Description
The project will be a new infrastructure directly connecting the Austrian and Czech market and is connected to the project C4G of N4G at the AT/CZ
border.
Regulatory Decisions and
similar material conditions
Enabled Projects
Project Code Project Name
TRA-N-021 Bidirectional Austrian-Czech Interconnector (BACI, formerly LBL project)
Capacity Increments Variant For Modelling
Point
Operator
Year
From Gas System To Gas System Capacity
Poštorná / Reintal
Gas Connect Austria GmbH
2020
CZ
AT
1,118.1 GWh/d
Comment: The incremental capacity represents an entry capacity extension above planned exit
capacity at CZ/AT border. GCV:11.19
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 8 of 620