Revythoussa (2nd upgrade)
General Information
Promoter
DESFA S.A.
Operator
DESFA S.A.
Host Country
Greece
Status
Under Construction
Website
Project's URL
Publication Approval Status
Approved
Sponsors
DESFA
100%
LNG-F-147
Project
LNG Terminal
FID
Update Date
04/07/2016
Advanced
Description
The projects consists of: - the upgrading of the send-out capacity from 1000 to 1400 m3/h (from 14,14 to 19,82 Nm3/d) - the upgrading of the
storage capacity from 130.000 m3 to 225.000 m3 with the addition of a 3rd tank - the increase of maximum ship size from 140.000 to 260.000 m3
Regulatory Decisions and
similar material conditions
Capacity Increments Variant For Modelling
Point
Operator
Year
From Gas System To Gas System Capacity
Agia Triada
DESFA S.A.
2017
LNG_Tk_GR
GR
80.4 GWh/d
Schedule
Start Date
End Date
Pre-Feasibility
Feasibility
FEED
Market Test
Permitting
Supply Contracts
FID
Construction
12/2017
Commissioning
2017
2017
NDP and PCI Information
Part of NDP
Yes (Development Plan NNGS 2015-2024)
NDP Number
2.2.1.5
Currently PCI
No
CBCA Decision
No
Market Survey
Not Relevant (no CBCA decision)
Third-Party Access Regime
Considered TPA Regime
Regulated
Considered Tariff Regime
Regulated
Applied for Exemption
No
Exemption Granted
Not Relevant
Exemption in entry direction
0.00%
Exemption in exit direction
0.00%
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 234 of 620
Current TYNDP : TYNDP 2017 - Annex A
Southern Corridor GRIP 2017–2026 Annex B |
93