Table of Contents Table of Contents
Previous Page  190-191 / 610 Next Page
Information
Show Menu
Previous Page 190-191 / 610 Next Page
Page Background

Expected Gas Sourcing

Caspian Region, LNG ()

Benefits

Main Driver

Regulation SoS

Main Driver Explanation

Benefit Description

The project will enable the Greek gas transmission system to be supplied by an additional gas source and route.

PCI Details

PCI Benefits

Project concerns investment in reverse flow capacity

General Criteria Fulfilled

Yes

Specific Criteria Fulfilled

Competition, Market Integration, Security of Supply

Specific Criteria Fulfilled Comments

Pipelines and Compressor Stations

Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Nea-Messivria to TAP

1

Total

1

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 249 of 620

Current TYNDP : TYNDP 2017 - Annex A

Southern Corridor GRIP 2017–2026 Annex B |

96