Compressor Station Kipi
TRA-N-128
Project
Pipeline including CS
Non-FID
Update Date
04/07/2016
Non-Advanced
Description
The project consists of a Compressor Station on the GR side of the GR/TK border aiming at increasing the capacity of the Greek transmission system
in order to make possible the transmission of natural gas to the Greek and European markets with the use of downstream transmission systems.
Depending on the variant that will be implemented the configuration will be (1+1) x 4.5 MW or( 1+1) x 9.7 MW or (2+1) x 9.7 MW.
Regulatory Decisions and
similar material conditions
Capacity Increments Variant For Modelling
Variant : 103.20 GWh/d
case where TAP will be, from the beginning, connected to TANAP at the GR/TR border, and
IGB will be supplied by TAP therefore the C/S will supply gas to the DESFA system and the
ones of neighbouring operators.
Point
Operator
Year
From Gas System To Gas System Capacity
Kipi (TR) / Kipi (GR)
DESFA S.A.
2020
TRi
IB-GRk
54.4 GWh/d
Comment: 3 bcm/y
Komotini (DESFA) Bottleneck
DESFA S.A.
2020
IB-GRk
GR
54.4 GWh/d
Comment: 3 bcm/y
Capacity Increments Variant(s) For Information Only
Variant : 206.40 GWh/d
case where TAP will be, from the beginning, connected to TANAP at the GR/TR border, and
IGB will be supplied by the DESFA network therefore the C/S will supply gas to the DESFA
system and the ones of neighbouring operators through IGB.
Point
Operator
Year
From Gas System To Gas System Capacity
Kipi (TR) / Kipi (GR)
DESFA S.A.
2020
TRi
IB-GRk
157.8 GWh/d
Comment: 6 bcm/y