Compressor Station Kipi

TRA-N-128

Project

Pipeline including CS

Non-FID

Update Date

04/07/2016

Non-Advanced

Description

The project consists of a Compressor Station on the GR side of the GR/TK border aiming at increasing the capacity of the Greek transmission system

in order to make possible the transmission of natural gas to the Greek and European markets with the use of downstream transmission systems.

Depending on the variant that will be implemented the configuration will be (1+1) x 4.5 MW or( 1+1) x 9.7 MW or (2+1) x 9.7 MW.

Regulatory Decisions and

similar material conditions

Capacity Increments Variant For Modelling

Variant : 103.20 GWh/d

case where TAP will be, from the beginning, connected to TANAP at the GR/TR border, and

IGB will be supplied by TAP therefore the C/S will supply gas to the DESFA system and the

ones of neighbouring operators.

Point

Operator

Year

From Gas System To Gas System Capacity

Kipi (TR) / Kipi (GR)

DESFA S.A.

2020

TRi

IB-GRk

54.4 GWh/d

Comment: 3 bcm/y

Komotini (DESFA) Bottleneck

DESFA S.A.

2020

IB-GRk

GR

54.4 GWh/d

Comment: 3 bcm/y

Capacity Increments Variant(s) For Information Only

Variant : 206.40 GWh/d

case where TAP will be, from the beginning, connected to TANAP at the GR/TR border, and

IGB will be supplied by the DESFA network therefore the C/S will supply gas to the DESFA

system and the ones of neighbouring operators through IGB.

Point

Operator

Year

From Gas System To Gas System Capacity

Kipi (TR) / Kipi (GR)

DESFA S.A.

2020

TRi

IB-GRk

157.8 GWh/d

Comment: 6 bcm/y

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM