General Information
Promoter
DESFA S.A.
Operator
DESFA S.A.
Host Country
Greece
Status
Planned
Website
Project's URL
Publication Approval Status
Approved
Sponsors
DESFA S.A.
100%
Pipelines and Compressor Stations
103.20 GWh/d
case where TAP will be, from the beginning, connected to
TANAP at the GR/TR border, and IGB will be supplied by TAP
therefore the C/S will supply gas to the DESFA system and
the ones of neighbouring operators.
Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Kipi
0
0
9
Total
0
9
Schedule
Start Date
End Date
Pre-Feasibility
Feasibility
FEED
Market Test
Permitting
Supply Contracts
FID
Construction
Commissioning
2020
2020
NDP and PCI Information
Part of NDP
Yes (Development Plan NNGS 2015-2024)
NDP Number
2.2.1.3
Currently PCI
Yes (6.9.3 and 7.4.1)
CBCA Decision
No
Market Survey
Not Relevant (no CBCA decision)
Third-Party Access Regime
Considered TPA Regime
Regulated
Considered Tariff Regime
Regulated
Applied for Exemption
No
Exemption Granted
Not Relevant
Exemption in entry direction
0.00%
Exemption in exit direction
0.00%
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 232 of 620
Current TYNDP : TYNDP 2017 - Annex A
Southern Corridor GRIP 2017–2026 Annex B |
98