General Information

Promoter

DESFA S.A.

Operator

DESFA S.A.

Host Country

Greece

Status

Planned

Website

Project's URL

Publication Approval Status

Approved

Sponsors

DESFA S.A.

100%

Pipelines and Compressor Stations

103.20 GWh/d

case where TAP will be, from the beginning, connected to

TANAP at the GR/TR border, and IGB will be supplied by TAP

therefore the C/S will supply gas to the DESFA system and

the ones of neighbouring operators.

Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Kipi

0

0

9

Total

0

9

Schedule

Start Date

End Date

Pre-Feasibility

Feasibility

FEED

Market Test

Permitting

Supply Contracts

FID

Construction

Commissioning

2020

2020

NDP and PCI Information

Part of NDP

Yes (Development Plan NNGS 2015-2024)

NDP Number

2.2.1.3

Currently PCI

Yes (6.9.3 and 7.4.1)

CBCA Decision

No

Market Survey

Not Relevant (no CBCA decision)

Third-Party Access Regime

Considered TPA Regime

Regulated

Considered Tariff Regime

Regulated

Applied for Exemption

No

Exemption Granted

Not Relevant

Exemption in entry direction

0.00%

Exemption in exit direction

0.00%