Table of Contents Table of Contents
Previous Page  20-21 / 610 Next Page
Information
Show Menu
Previous Page 20-21 / 610 Next Page
Page Background

Benefits

Main Driver

Market Demand

Main Driver Explanation

Benefit Description

Pipelines and Compressor Stations

Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Břeclav-Baumgarten Interconnection (BBI) AT

The incremental capacity represents an entry capacity

extension between the market areas of CZ and AT

1,400

49

10

Total

49

10

Schedule

Start Date

End Date

Pre-Feasibility

Feasibility

FEED

Market Test

04/2016

Permitting

03/2016

Supply Contracts

FID

Construction

10/2020

Commissioning

2020

2020

NDP and PCI Information

Part of NDP

No (The BBI project is a new project and

will be part of the NDP 2017-2026.)

NDP Number

GCA2015/01

Currently PCI

No

CBCA Decision

No

Market Survey

Not Relevant (no CBCA decision)

Third-Party Access Regime

Considered TPA Regime

Regulated

Considered Tariff Regime

Regulated

Applied for Exemption

No

Exemption Granted

Not Relevant

Exemption in entry direction

0.00%

Exemption in exit direction

0.00%

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 9 of 620

Current TYNDP : TYNDP 2017 - Annex A

Southern Corridor GRIP 2017–2026 Annex B |

11