Time Schedule
Grant Obtention Date
16/04/2015
Delay Since Last TYNDP
12 months in commissining date / same delay in FID
PCI Details
PCI Benefits
Project aims at fulfilling the infrastructure standard (N-1) rule at regional level in accordance with Article 6(3) of Regulation EU, Project aims at
supplying directly or indirectly at least two Member States
General Criteria Fulfilled
Yes
Specific Criteria Fulfilled
Competition, Market Integration, Security of Supply, Sustainability
Specific Criteria Fulfilled Comments
Market Integration - Regional (SEE + Serbia + FYROM) and beyond (e.g. Hungary and through across the NSI gas corridor) Security of Supply
through inter alia source and route diversification- Greece, Bulgaria, Serbia, FYROM, Hungary, Ukraine, Turkey Enhances competition in the
region by introducing new sources and routes of supply Sustainability - Supports back up to renewables and power to gas
Pipelines and Compressor Stations
Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Alexandroupolis LNG terminal - M/R Amfitriti
762
28
0
Total
28
0
Schedule
Start Date
End Date
Pre-Feasibility
12/2010
Feasibility
01/2014
06/2014
FEED
05/2016
12/2016
Market Test
03/2017
Permitting
12/2010
01/2015
Supply Contracts
FID
12/2016
Construction
04/2017
06/2018
Commissioning
2018
2018
NDP and PCI Information
Part of NDP
No (The Project is not included in the NDP
because it is an Independent Natural Gas
System and therefore the NTSO is not
obliged to include it in the NDP because it
is not the Project's promoter and/or
operator.)
NDP Number
Currently PCI
Yes (6.9.1 )
CBCA Decision
No
Market Survey
Not Relevant (no CBCA decision)
Third-Party Access Regime
Considered TPA Regime
Regulated
Considered Tariff Regime
Regulated
Applied for Exemption
No
Exemption Granted
Not Relevant
Exemption in entry direction
0.00%
Exemption in exit direction
0.00%
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 228 of 620
Current TYNDP : TYNDP 2017 - Annex A
Southern Corridor GRIP 2017–2026 Annex B |
132