Hungarian section of Tesla project
General Information
Promoter
FGSZ Ltd.
Operator
FGSZ Ltd.
Host Country
Hungary
Status
Planned
Website
Publication Approval Status
Approved
Sponsors
FGSZ Ltd.
100%
TRA-N-585
Project
Pipeline including CS
Non-FID
Update Date
27/05/2016
Non-Advanced
Description
The main aim of the Tesla project is to transport natural gas from the planned Turkish Stream (RU-TR) to Central and Eastern Europe via Greece,
Macedonia, Serbia, Hungary and Austria. The Hungarian section is part of the TR-GR-FYROM-SRB-HU-AT corridor. The main flow direction is from
Turkey to Austria, but accoridng to EU rules we intend to ensure the reverse flow (from Austria to Turkey) with the same capacity as the main flow
direction.
Regulatory Decisions and
similar material conditions
Capacity Increments Variant For Modelling
Point
Operator
Year
From Gas System To Gas System Capacity
TESLA / HU Offtake
FGSZ Ltd.
2020
HU/TLA
HU
175.0 GWh/d
TESLA / RS>HU
FGSZ Ltd.
2020
RS/TLA
HU/TLA
582.0 GWh/d
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 331 of 620
Current TYNDP : TYNDP 2017 - Annex A
Southern Corridor GRIP 2017–2026 Annex B |
153