Expected Gas Sourcing

Algeria, Norway, Russia, LNG (HR)

Benefits

Main Driver

Market Demand

Main Driver Explanation

At the moment FGSZ is able to ensure only interruptible capacity at IP Beregdaróc (HU>UA direction). Ukrainian party always requests firm capacity, and

this new entry point is very important for Ukraine.

Benefit Description

Barriers

Barrier Type

Description

Others

Financing difficulties.

Pipelines and Compressor Stations

Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Hungarian section

Piping installation at Városföld, Hajdúszoboszló, Beregdaróc

nodes and compressor stations and aftercoolers, which

enables the reverse flow. Measuring station is also necessary at

Beregdaróc node.

0

Total

0

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM