Ercsi-Szazhalombatta
General Information
Promoter
FGSZ Ltd.
Operator
FGSZ Ltd.
Host Country
Hungary
Status
Planned
Website
Publication Approval Status
Approved
Sponsors
FGSZ Ltd.
100%
TRA-N-061
Project
Pipeline including CS
Non-FID
Update Date
06/05/2016
Non-Advanced
Description
New pipeline between Ercsi and Szazhalombatta nodes, DN800 PN63, 11 km. The 11 km long pipeline connecting the Városföld-Ercsi-Győr pipeline
at Ercsi to the Budapest ring at Százhalombatta (Central Hungary) – it increases the capacity of the HU-SK interconnector up to 152 GWh/d; 600 000
m3/h (at 15 °C) in both directions in the FGSZ system.
Regulatory Decisions and
similar material conditions
Enabled Projects
Project Code Project Name
TRA-N-123 Városföld CS
TRA-N-018 Városföld-Ercsi-Győr
Capacity Increments Variant For Modelling
Point
Operator
Year
From Gas System To Gas System Capacity
Vecsés MGT / FGSZ
FGSZ Ltd.
2022
HUi
HU
25.5 GWh/d