Main Driver Explanation

Benefit Description

o The Hungarian projects taken as a whole main aim, is to enhance the flexibility of the Hungarian transmission system by connecting to neighbouring

systems, ensuring reserves flow availability, and guaranteeing flow deliverability which will enhance the transmission systems security of supply position

along with helping with further market integration. In particular, this project helps the reverse flow from Varösföld to Beregdaroc.

Time Schedule

Grant Obtention Date

Delay Since Last TYNDP

Yes, 1 year.

Delay Explanation

Due to decreasing transmission volume the project was rescheduled.

Pipelines and Compressor Stations

Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

hajdúszoboszló CS

6

Hajduszoboszlo node

No cross-border (interconnection point) relevance.

0

Total

6