Benefits
Main Driver
Others
Main Driver Explanation
Benefit Description
o The Hungarian projects taken as a whole main aim, is to enhance the flexibility of the Hungarian transmission system by connecting to neighbouring
systems, ensuring reserves flow availability, and guaranteeing flow deliverability which will enhance the transmission systems security of supply position
along with helping with further market integration. In particular, this project helps the reverse flow from Varösföld to Beregdaroc.
Time Schedule
Grant Obtention Date
Delay Since Last TYNDP
Yes, 1 year.
Delay Explanation
Due to decreasing transmission volume the project was rescheduled.
Pipelines and Compressor Stations
Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
hajdúszoboszló CS
6
Hajduszoboszlo node
No cross-border (interconnection point) relevance.
0
Total
6