Technical Information (UGS)
Storage Facility
Palazzo Moroni
Storage Facility Type
Depleted Field
Multiple-Cycle
No
Working Volume (mcm)
50.00
in 10^6 Sm^3
PCI Details
PCI Benefits
Project aims at fulfilling the infrastructure standard (N-1) rule at regional level in accordance with Article 6(3) of Regulation EU, Project aims at
supplying directly or indirectly at least two Member States
General Criteria Fulfilled
Yes
Specific Criteria Fulfilled
Competition, Market Integration, Security of Supply
Specific Criteria Fulfilled Comments
Security of Supply and Market Integration (Increase of competition); The Italian Storage system is a market characterized by two operators
(Stogit Spa 97% and Edison Stoccaggio Spa 3% o f the market share), and our projects will enhance the level of competition at national level. It
is necessary having in mind that only storage jointly with production are present on national territory and can intervene in case of serious gas
crisis. New storages are more flexible to operate for security of supply and to work as back up to renewables. The project increases security of
supply on European gas system. The project brings some benefits in case of disruption on critical gas supply routes (such as Ukraine and Libya)
towards Italy and more broadly Europe Our project is also synergic to develop Italian system as a gas hub and to improve Europe security of
supply.
Schedule
Start Date
End Date
Pre-Feasibility
Feasibility
01/2009
01/2013
FEED
01/2013
01/2017
Market Test
01/2019
Permitting
01/2009
01/2017
Supply Contracts
FID
01/2017
Construction
01/2017
01/2019
Commissioning
2019
2019
NDP and PCI Information
Part of NDP
Yes (National Energy Strategy)
NDP Number
No Number
Currently PCI
No
CBCA Decision
No
Market Survey
Not Relevant (no CBCA decision)
Third-Party Access Regime
Considered TPA Regime
Regulated
Considered Tariff Regime
Regulated
Applied for Exemption
No
Exemption Granted
No
Exemption in entry direction
0.00%
Exemption in exit direction
0.00%