GALSI Pipeline Project
TRA-N-012
Project
Pipeline including CS
Non-FID
Update Date
09/05/2016
Advanced
Description
Gas pipeline project aiming to create a new link between Algeria and Italy via Sardinia. It will be the first direct route between Algeria and Italy
transporting 8 billions mc of gas. From El Kala (Koudiet Draouche) in Algeria an offshore section will cross the Mediterranean Sea going down to
2.800 m of depth getting to Porto Botte in Sardinia (which will be the entry point in the Italian RNG - Rete Nazionale Gasdotti or Gas National
Network). From Porto Botte an onshore section will cross Sardinia towards Olbia in the north of the island (with 39 offtake point along the route to
finally bring the long awaited gas to Sardinian users and thus remove the isolation of Sardinia from RNG). From Olbia then another offshore section
of the pipeline will cross the Tyrrhenian Sea at around 800 m of depth to get to Piombino in Tuscany where the pipeline will be connected with the
existing Rete Nazionale Gasdotti of Snam Rete Gas.
Regulatory Decisions and
similar material conditions
The Project has already received from the competent Italian Ministry (Ministero dello Sviluppo Economico) a Priority Allocation (Allocazione
Prioritaria) for 100% of its capacity for a period of 25 years.
Capacity Increments Variant For Modelling
Point
Operator
Year
From Gas System To Gas System Capacity
Koudiet Eddraouch (Galsi) (DZ)
Galsi S.p.A.
2019
DZ
DZi/GAL
258.0 GWh/d
Comment: Entry of GALSI International Section
Increment is equivalent to 8 bcm/y
Olbia (Galsi)
Galsi S.p.A.
2019
ITs
ITn/GAL
258.0 GWh/d
Comment: Increment is equivalent to 8 bcm/y
Galsi S.p.A.
2019
ITn/GAL
ITs
32.0 GWh/d
Comment: Equivalent to 1 bcm/y
Piombino (Galsi)
Galsi S.p.A.
2019
ITn/GAL
IB-ITs
226.0 GWh/d
Comment: Equivalent to 7 bcm/y
Porto Botte (Galsi)
Galsi S.p.A.
2019
DZi/GAL
ITs
258.0 GWh/d
Comment: Exit of GALSI International Section
Increment is equivalent to 8 bcm/y
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM