General Information
Promoter
Galsi S.p.A.
Operator
Galsi S.p.A.
Host Country
Italy
Status
Planned
Website
Project's URL
Publication Approval Status
Approved
Sponsors
Sonatrach
47%
Edison SpA
23%
Enel Produzione SpA
17%
Hera SpA
11%
Pipelines and Compressor Stations
Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
GALSI International Section
The GALSI International Section includes a compression station
on the Algerian coast (3x33 MW) and a gas sealine from
Algerian coast to South Sardinia coast (Porto Botte, near
Cagliari)
660
288
99
GALSI Italian Section 1 onshore pipeline crossing Sardinia
The GALSI National Section will become integral part of the
Italian National Gas Network, with the Entry Point located at
the landfall of the sealine from Algeria in South Sardinia coast
(Porto Botte). In Sardinia the project foresees 39 offtake points.
1,219
285
Schedule
Start Date
End Date
Pre-Feasibility
12/2006
Feasibility
01/2006
12/2006
FEED
01/2007
12/2010
Market Test
10/2010
Permitting
07/2008
05/2016
Supply Contracts
05/2016
FID
05/2016
Construction
06/2016
06/2019
Commissioning
2019
2019
NDP and PCI Information
Part of NDP
Yes (SNAM NDP 2015 (page 61))
NDP Number
n.a.
Currently PCI
Yes (5.20)
CBCA Decision
No
Market Survey
Not Relevant (no CBCA decision)
Third-Party Access Regime
Considered TPA Regime
Not Applicable
Considered Tariff Regime
Not Applicable
Applied for Exemption
Not Relevant
Exemption Granted
Not Relevant
Exemption in entry direction
0.00%
Exemption in exit direction
0.00%
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 357 of 620
Current TYNDP : TYNDP 2017 - Annex A
Southern Corridor GRIP 2017–2026 Annex B |