Development on the Romanian territory of the NTS (BG–RO-HU-AT Corridor)
General Information
Promoter
SNTGN Transgaz S.A.
Operator
SNTGN Transgaz S.A.
Host Country
Romania
Status
Planned
Website
Project's URL
Publication Approval Status
Approved
Sponsors
SNTGN Transgaz S.A.
100%
TRA-N-358
Project
Pipeline including CS
Non-FID
Update Date
15/09/2016
Advanced
Description
The scope of the project is the construction of a new gas transmission pipeline to enable the connection between the Technological Hub Podisor
and GMS Horia and the construction of compressor stations along the route (CS Jupa, CS Bibesti and CS Podisor). Transgaz considers the
development of the BRHA Project in stages, as follows: Stage I � Gas transmission pipeline Podişor-Recaș 32” x 63 bar, approximately 478 km long; �
Three gas compressor stations (CS Podisor, CS Bibesti, CS Jupa) each station is equipped with two compressor units which may enable bidirectional
gas flows. Upon the completion of Stage I the following transmission capacities will be ensured: � towards Hungary: 1,75 billion m3/year; � towards
Bulgaria: 1,5 billion m3/year. Stage II � gas transmission pipeline Recaş–Horia 32” x 63 bar, approximately 50 km long; � expansion of the three gas
compressor stations (CS Podisor, CS Bibesti and CS Jupa) by mounting an additional compressor unit in each station); � Expan
Regulatory Decisions and
similar material conditions
Cross Border Cost Allocation Decision (CBCA)
Capacity Increments Variant For Modelling
Point
Operator
Year
From Gas System To Gas System Capacity
Csanadpalota
SNTGN Transgaz S.A.
2020
HU
RO
76.5 GWh/d
SNTGN Transgaz S.A.
2020
RO
HU
126.1 GWh/d
Ruse (BG) / Giurgiu (RO)
SNTGN Transgaz S.A.
2020
RO
BGn
29.3 GWh/d
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM