Eastring - Romania
General Information
Promoter
SNTGN Transgaz SA
Operator
SNTGN Transgaz S.A.
Host Country
Romania
Status
Planned
Website
Project's URL
Publication Approval Status
Approved
Sponsors
Transgaz S.A.
100%
TRA-N-655
Project
Pipeline including CS
Non-FID
Update Date
03/06/2016
Non-Advanced
Description
Eastring-RO, located in Romania is an essential part of the Eastring project, which connects IP Veľké Kapušany / Veľké Zlievce at the SK-UA border,
with IP at the BG/TR border. Eastring is a natural gas pipeline project. It will not own or sell any natural gas and once available, all its capacity will be
offered to any shipper on non-discriminatory basis respecting all EU rules and laws (Directives and Regulations). Eastring will connect the existing
gas infrastructure between Slovakia, Hungary, Romania and Bulgaria in a bidirectional conjunction bringing a new transit potential and improving
gas market situation in each of the respective countries. Maximum daily bi-directional capacity will be of 20 bcm/year (Stage I) and 40 bcm/year
(Stage II). The project would secure supplies in case of RU disruption and therefore it will increase gas SoS in the broader Central-South-East EU
region, as well as will allow access to alternative gas sources for Central, Western & Southern Europe
Regulatory Decisions and
similar material conditions
Capacity Increments Variant For Modelling
Point
Operator
Year
From Gas System To Gas System Capacity
Eastring Cross-Border BG/EAR <> RO/EAR
SNTGN Transgaz S.A.
2021
BG/EAR
RO/EAR
570.0 GWh/d
SNTGN Transgaz S.A.
2021
RO/EAR
BG/EAR
570.0 GWh/d
SNTGN Transgaz S.A.
2025
BG/EAR
RO/EAR
570.0 GWh/d
SNTGN Transgaz S.A.
2025
RO/EAR
BG/EAR
570.0 GWh/d
Eastring Cross-Border RO/EAR <> HU/EAR
SNTGN Transgaz S.A.
2021
HU/EAR
RO/EAR
570.0 GWh/d
SNTGN Transgaz S.A.
2021
RO/EAR
HU/EAR
570.0 GWh/d
SNTGN Transgaz S.A.
2025
HU/EAR
RO/EAR
570.0 GWh/d
SNTGN Transgaz S.A.
2025
RO/EAR
HU/EAR
570.0 GWh/d
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 495 of 620
Current TYNDP : TYNDP 2017 - Annex A
Southern Corridor GRIP 2017–2026 Annex B |
242