Depomures
General Information
Promoter
Engie Romania SA
Operator
Depomures
Host Country
Romania
Status
Planned
Website
Project's URL
Publication Approval Status
Approved
Sponsors
GDF International
59%
UGS-N-233
Project
Storage Facility
Non-FID
Update Date
23/05/2016
Advanced
Description
The project consists in the revamping and expansion of an existing gas storage facility of 300 mcm situated in Targu Mures, Central Romania. The
rationale of the project is three fold (i) increase operational independence by building its own compression unit as currently compression services
are rented from another party (ii) gradually expand the storage capacity (from 300 mcm to 400 mcm in a first stage and to 600 mcm in a second
stage) and (iii) increase flexibility of the storage by increasing injection and withdrawing capacity from the existing average 1.7 mcm/ day to approx.
5.0 mcm/day after implementation of the second stage. The implementation of the first stage has already been initiated with a partial investment to
be finalized in 2016, while the FID for the entire phase I of the development project is expected in 2016.
Regulatory Decisions and
similar material conditions
Capacity Increments Variant For Modelling
Point
Operator
Year
From Gas System To Gas System Capacity
UGS Targu Mures
Depomures
2019
STcRO
RO
15.8 GWh/d
Comment: To be considered for modeling purposes.
Depomures
2019
RO
STcRO
15.8 GWh/d
Comment: To be considered for modeling purposes.
Depomures
2022
STcRO
RO
18.9 GWh/d
Comment: To be considered for modeling purposes.
Depomures
2022
RO
STcRO
18.9 GWh/d
Comment: To be considered for modeling purposes.