M3 pipeline reconstruction from CS Ajdovščina to Šempeter/Gorizia
General Information
Promoter
Plinovodi d.o.o.
Operator
Plinovodi d.o.o.
Host Country
Slovenia
Status
Planned
Website
Project's URL
Publication Approval Status
Approved
Sponsors
Plinovodi
100%
TRA-N-108
Project
Pipeline including CS
Non-FID
Update Date
22/05/2016
Non-Advanced
Description
Interconnector with the Italian TSO. Adjustment to operating parameters of the transmission system of the Italian TSO.
Regulatory Decisions and
similar material conditions
Capacity Increments Variant For Modelling
Point
Operator
Year
From Gas System To Gas System Capacity
Gorizia (IT) /Šempeter (SI)
Plinovodi d.o.o.
2020
IT
SI
35.5 GWh/d
Plinovodi d.o.o.
2020
SI
IT
38.0 GWh/d
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 517 of 620
Current TYNDP : TYNDP 2017 - Annex A
Southern Corridor GRIP 2017–2026 Annex B |