Previous Page  12 / 40 Next Page
Information
Show Menu
Previous Page 12 / 40 Next Page
Page Background

1 2

| W I R E L I N E

|

SUMMER 2017

Cut your well abandonment milling costs

in a single trip.

The ProMILL* trip-saving milling and underreaming system combines a bridge plug assembly, a section

mill, and a high-ratio underreamer to achieve rock-to-rock zonal isolation. This prepares the foundation for

an abandonment cement barrier in a single run, rather than in four as required by conventional systems.

One operator in the North Sea saved 7.5 rig days and USD 1 million using the ProMILL system—why not you?

*Mark of Schlumberger. Copyright © 2017 Schlumberger. All rights reserved. 17-BDT-228892

Find out more at

slb.com/promill

ProMILL

TRIP-SAVING MILLING AND

UNDERREAMING SYSTEM

High-ratio underreamer

Bridge plug assembly

Section mill