1 2
| W I R E L I N E
|
SUMMER 2017
Cut your well abandonment milling costs
in a single trip.
The ProMILL* trip-saving milling and underreaming system combines a bridge plug assembly, a section
mill, and a high-ratio underreamer to achieve rock-to-rock zonal isolation. This prepares the foundation for
an abandonment cement barrier in a single run, rather than in four as required by conventional systems.
One operator in the North Sea saved 7.5 rig days and USD 1 million using the ProMILL system—why not you?
*Mark of Schlumberger. Copyright © 2017 Schlumberger. All rights reserved. 17-BDT-228892
Find out more at
slb.com/promillProMILL
TRIP-SAVING MILLING AND
UNDERREAMING SYSTEM
High-ratio underreamer
Bridge plug assembly
Section mill