ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Main Report - page 11

Southern Corridor GRIP 2014–2023 |
11
The following list contains all projects in the Southern
Corridor Region, presented in two tables by country:
• one for the projects sponsored by TSOs and
• one for the projects sponsored by 3
rd
parties.
One additional table includes the projects spanning over
several countries.
The project code is the same as the one the projects had in the TYNDP 2013–2022.
In order to ensure consistency the code has not been updated in case a project
reached, in the meantime, FID status (this is for instance the case of TAP project or
of the reverse flow project at the Greek/Bulgarian border). In such cases a note has
been inserted. On the other hand some TSO projects in the Region have been
deleted from the list as mentioned below.
2.1. TYNDP 2013–2022 Projects
not included in the Southern
Corridor GRIP list
The following TSO projects, that make part of the TYNDP 2013–2022, have been
excluded from the GRIP list of projects, with the agreement of the sponsoring TSOs,
either because they are already completed, either because they do not have Region-
al relevance or because they are no longer included in the TSOs’ planning.
Bulgartansgaz projects:
TRA-N-145
Black Sea CNG
Moreover Bulgartransgaz requested the following projects to be excluded from this
GRIP because they are completed or almost completed:
TRA-F-143
Reverse flow at the existing IP between BG and GR
(Kulata/Sidirokastro)
TRA-F-144
Reverse flow at the existing IPs between RO and BG
(Negru Voda I, II and III)
TRA-F-057
Interconnection Bulgaria – Romania
DESFA projects:
POW-F-028 Megalopoli pipeline
FGSZ projects:
TRA-N-019
Csepel connecting pipeline
TRA-N-065
Hajduszoboszlo CS
TRA-N-124
Local Odorisation