ENTSOG Gas Regional Investment Plan (GRIP) 2017 - 2026 / Southern Corridor / Main Report
Abbreviations
IGB
AD
Interconnector Greece Bulgaria
Average Day
IP
AGRI
Interconnection Point
Azerbaijan-Georgia-Romania Interconnector
ISO
Independent System Operator
AW
Average Winter
ITB
Interconnector Turkey Bulgaria
bcm
Billion Cubic Meter
ITO
Independent Transmission Operator
BOTAŞ
BOTAŞ Petroleum Pipeline Corporation (Turkey)
km
Kilometer
LNG
Liquified Natural Gas
CAM
Capacity Allocation Mechanisms
mcm
Million cubic meter
CCGT
mm
Combined Cycle Gas Turbine
Millimeter
MRS
CEE
Metering & Regulating Station
Central Eastern Europe
MW
CEGH
Mega Watt
Central European Gas Hub
NBP
CESEC
National Balancing Point (UK)
Central and South Eastern Europe Gas Connectivity
NSI
North South Interconnections
CMP
Congestion Management Procedures
OU
Ownership Unbundling
PCI
Project of Common Interest
CNG
Compressed Natural Gas
PowerG
Power Generation
CO 2
Carbon Dioxide
RCI
Residential-Commercial-Industrial
CS
Compressor Station
RES
Renewable Energy Sources
DC
Design Case
SC
Southern Corridor
DN
Nominal Diameter
SCP
South Caucasus Pipeline
DSO
Distribution System Operator
SOCAR
State Oil Company of Azerbaijan Republic
EC
European Commission
ENTSOG
European Network of Transmission System Operator for Gas
TANAP
Trans Anatolian Pipeline
TAP
Trans Adriatic Pipeline
TSO
ETS
Transmission System Operator
Emission Trading Scheme
TYNDP
EU
Ten-Year Network Development Plan
European Union
UGS
FID
Underground Storage
Final Investment Decision
GRIP
UR
Gas Regional Investment Plan
Uniform Risk
USA
GRS
United States of America
Gas Receiving Station
WGV
GWh/y
Working Gas Volume
Giga Watt hour/year
IAP
Ionian Adriatic Pipeline
120 |
Southern Corridor GRIP 2017–2026
Made with FlippingBook - Online magazine maker