ENTSOG Gas Regional Investment Plan (GRIP) 2017 - 2026 / Southern Corridor / Main Report
TSO PROJECTS
Commissioning (TYNDP 2017)
No. Project
TYNDP Code
Status
TSO/Sponsor
Compressor station 1 at the Croatian gas transmission system LNG evacuation pipeline Omišalj - Zlobin (Croatia) Interconnection Croatia Slovenia (Lučko-Zabok-Rogatec) Interconnection Croatia -Bosnia and Herzegovina (Slobodnica- Bosanski Brod) LNG evacuation pipeline Zlobin- Bosiljevo-Sisak-Kozarac Interconnection Croatia-Bosnia and Herzegovina (South) Compressor stations 2 and 3 at the Croatian gas tranmission system Interconnection Croatia/Serbia (Slobdnica-Sotin-Bačko Novo Selo) LNG Evacuation Pipeline Kozarac- Slobodnica Interconnection Croatia-Bosnia and Herzegovina (west) Interconnection Croatia/Slovenia (Umag-Koper)
1
TRA-F-334
FID PCI 6.26.3
2017*
Advanced Non-FID PCI 6.5.1
2
TRA-N-090
2018*
3
TRA-F-086
FID** PCI 6.26.1
2019
4
TRA-N-066
Advanced Non-FID 2019
Advanced Non-FID PCI 6.5.2
5
TRA-N-075
2020
6
TRA-N-302
Advanced Non-FID 2021
7 Ionian Adriatic Pipeline
TRA-N-068
Advanced Non-FID 2022
Non-FID PCI 6.26.3
8
TRA-N-1057
2020
9
TRA-N-070
Non-FID
2023
Non-FID PCI 6.5.2
10
TRA-N-1058
2023
11
TRA-N-303
Non-FID
2026
12
TRA-N-336
Non-FID
2026
THIRD PARTY PROJECTS
Commissioning (TYNDP 2017)
No. Project
TYNDP Code
Status
TSO/Sponsor
Non-FID PCI 6.5.1
1 LNG terminal Krk
LNG-N-082
2018*
* Commissioning date has been updated to 2020 ** This project has lost its FID status