ENTSOG Gas Regional Investment Plan (GRIP) 2017 - 2026 / Southern Corridor / Main Report
Murfeld/Ceršak (Gas Connect Austria > Plinovodi) unidirectional
GWh/d
GWh/d
IP Murfeld / Ceršak (AT > SI)
IP Murfeld / Ceršak (AT > SI)
160 140 100 120
160 140 100 120
0 80 60 40 20
0 80 60 40 20
Apr 2014
Jun 2014
Aug 2014
Oct 2014
Dec 2014
Feb 2015
Apr 2015
Jun 2015
Aug 2015
Oct 2015
Dec 2015
Feb 2016
Apr 2014
Jun 2014
Aug 2014
Oct 2014
Dec 2014
Feb 2015
Apr 2015
Jun 2015
Aug 2015
Oct 2015
Dec 2015
Feb 2016
Technical Capacity
Booked non interruptible + interruptible Capacity Booked non interruptible Capacity
Flow
Average daily
Range
Booked non interruptible + interruptible Capacity
Technical Capacity
Figure 5.5: Murfeld/Ceršak: Flows and booked capacity vs. technical capacity (monthly)
Figure 5.6: Murfeld/Ceršak : Flows and booked capacity vs. technical capacity (daily)
Tarvisio/Arnoldstein (Trans Austria Gasleitung > Snam Rete Gas) bidirectional
1,400 GWh/d
GWh/d 1,400
IP Arnoldstein (AT > IT)
IP Arnoldstein (AT > IT)
1,200
1,200
1,000
1,000
800
800
600
600
400
400
200
200
0
0
Apr 2014
Jun 2014
Aug 2014
Oct 2014
Dec 2014
Feb 2015
Apr 2015
Jun 2015
Aug 2015
Oct 2015
Dec 2015
Feb 2016
Apr 2014
Jun 2014
Aug 2014
Oct 2014
Dec 2014
Feb 2015
Apr 2015
Jun 2015
Aug 2015
Oct 2015
Dec 2015
Feb 2016
Booked non interruptible + interruptible Capacity Booked non interruptible Capacity
Flow
Technical Capacity
Average daily
Range
Booked non interruptible + interruptible Capacity
Technical Capacity
Figure 5.7: Tarvisio/Arnoldstein: Flows and booked capacity vs. technical capacity (monthly)
Figure 5.8: Tarvisio/Arnoldstein : Flows and booked capacity vs. technical capacity (daily)
At the Interconnection point Exit Tarvisio/Entry Arnoldstein, physical reverse flow is possible. In particular Trans Austria Gasleitung GmbH is offering as firm capacity around 417GWh/d at the Austrian entry side and Snam Rete Gas is making available around 194 GWh/d at the Italian exit side 2) . Nevertheless, under the current prevailing hub prices conditions, the activation of these flows is likely to be triggered more by security of supply situations than by commercial reasons.
2) For years 2016 and 2017 Snam Rete Gas capacity is offered as “Interruptible transportation capacity available with a physical inlet flow or a physical flow equal to zero at the entry point of Passo Gries”. Starting from 2018 onward Snam Rete Gas capacity will be offered as firm but competing with Passo Gries capacity (source: Snam Rete Gas Ten-Year Network Development Plan 2016 – 2025).
Southern Corridor GRIP 2017–2026 |
63
Made with FlippingBook - Online magazine maker