ENTSOG Gas Regional Investment Plan (GRIP) 2017 - 2026 / Southern Corridor / Main Report

Murfeld/Ceršak (Gas Connect Austria > Plinovodi) unidirectional

GWh/d

GWh/d

IP Murfeld / Ceršak (AT > SI)

IP Murfeld / Ceršak (AT > SI)

160 140 100 120

160 140 100 120

0 80 60 40 20

0 80 60 40 20

Apr 2014

Jun 2014

Aug 2014

Oct 2014

Dec 2014

Feb 2015

Apr 2015

Jun 2015

Aug 2015

Oct 2015

Dec 2015

Feb 2016

Apr 2014

Jun 2014

Aug 2014

Oct 2014

Dec 2014

Feb 2015

Apr 2015

Jun 2015

Aug 2015

Oct 2015

Dec 2015

Feb 2016

Technical Capacity

Booked non interruptible + interruptible Capacity Booked non interruptible Capacity

Flow

Average daily

Range

Booked non interruptible + interruptible Capacity

Technical Capacity

Figure 5.5: Murfeld/Ceršak: Flows and booked capacity vs. technical capacity (monthly)

Figure 5.6: Murfeld/Ceršak : Flows and booked capacity vs. technical capacity (daily)

Tarvisio/Arnoldstein (Trans Austria Gasleitung > Snam Rete Gas) bidirectional

1,400 GWh/d

GWh/d 1,400

IP Arnoldstein (AT > IT)

IP Arnoldstein (AT > IT)

1,200

1,200

1,000

1,000

800

800

600

600

400

400

200

200

0

0

Apr 2014

Jun 2014

Aug 2014

Oct 2014

Dec 2014

Feb 2015

Apr 2015

Jun 2015

Aug 2015

Oct 2015

Dec 2015

Feb 2016

Apr 2014

Jun 2014

Aug 2014

Oct 2014

Dec 2014

Feb 2015

Apr 2015

Jun 2015

Aug 2015

Oct 2015

Dec 2015

Feb 2016

Booked non interruptible + interruptible Capacity Booked non interruptible Capacity

Flow

Technical Capacity

Average daily

Range

Booked non interruptible + interruptible Capacity

Technical Capacity

Figure 5.7: Tarvisio/Arnoldstein: Flows and booked capacity vs. technical capacity (monthly)

Figure 5.8: Tarvisio/Arnoldstein : Flows and booked capacity vs. technical capacity (daily)

At the Interconnection point Exit Tarvisio/Entry Arnoldstein, physical reverse flow is possible. In particular Trans Austria Gasleitung GmbH is offering as firm capacity around 417GWh/d at the Austrian entry side and Snam Rete Gas is making available around 194 GWh/d at the Italian exit side   2) . Nevertheless, under the current prevailing hub prices conditions, the activation of these flows is likely to be triggered more by security of supply situations than by commercial reasons.

 2) For years 2016 and 2017 Snam Rete Gas capacity is offered as “Interruptible transportation capacity available with a physical inlet flow or a physical flow equal to zero at the entry point of Passo Gries”. Starting from 2018 onward Snam Rete Gas capacity will be offered as firm but competing with Passo Gries capacity (source: Snam Rete Gas Ten-Year Network Development Plan 2016 – 2025).

Southern Corridor GRIP 2017–2026 |

63

Made with FlippingBook - Online magazine maker