ENTSOG Gas Regional Investment Plan (GRIP) 2017 - 2026 / Southern Corridor / Main Report

Gorizia/Šempeter (Snam Rete Gas > Plinovodi) bidirectional

GWh/d

30 GWh/d

IP Gorizia / Šempeter (IT > SI)

IP Gorizia / Šempeter (IT > SI)

30

25

25

20

20

15

15

10

10

5

5

0

0

Apr 2014

Jun 2014

Aug 2014

Oct 2014

Dec 2014

Feb 2015

Apr 2015

Jun 2015

Aug 2015

Oct 2015

Dec 2015

Feb 2016

Apr 2014

Jun 2014

Aug 2014

Oct 2014

Dec 2014

Feb 2015

Apr 2015

Jun 2015

Aug 2015

Oct 2015

Dec 2015

Feb 2016

Booked non interruptible + interruptible Capacity Booked non interruptible Capacity

Flow

Technical Capacity

Average daily

Range

Booked non interruptible + interruptible Capacity

Technical Capacity

Figure 5.9: Gorizia/Šempeter: Flows and booked capacity vs. technical capacity (monthly)

Figure 5.10: Gorizia/Šempeter: Flows and booked capacity vs. technical capacity (daily)

This IP has become bidirectional as of 1 January 2015. Before that date, capacity from Slovenia to Italy was offered only at the Italian side (technical firm capacity of 47 GWh/d), but no flow in that direction was regis- tered.

Gorizia/Šempeter (Plinovodi > Snam Rete Gas)

GWh/d

30 GWh/d

IP Gorizia / Šempeter (SI > IT)

IP Gorizia / Šempeter (SI > IT)

30

25

25

20

20

15

15

10

10

5

5

0

0

Apr 2014

Jun 2014

Aug 2014

Oct 2014

Dec 2014

Feb 2015

Apr 2015

Jun 2015

Aug 2015

Oct 2015

Dec 2015

Feb 2016

Apr 2014

Jun 2014

Aug 2014

Oct 2014

Dec 2014

Feb 2015

Apr 2015

Jun 2015

Aug 2015

Oct 2015

Dec 2015

Feb 2016

Booked non interruptible + interruptible Capacity Booked non interruptible Capacity

Flow

Technical Capacity

Average daily

Range

Booked non interruptible + interruptible Capacity

Technical Capacity

Figure 5.11: Gorizia/Šempeter: Flows and booked capacity vs. technical capacity (monthly)

Figure 5.12: Gorizia/Šempeter: Flows and booked capacity vs. technical capacity (daily)

The technical firm and interruptible capacity offered at the Italian side of the IP is between 47GWh/d and 51GWh/d.

64 |

Southern Corridor GRIP 2017–2026

Made with FlippingBook - Online magazine maker