ENTSOG Gas Regional Investment Plan (GRIP) 2017 - 2026 / Southern Corridor / Main Report

A pre-FEED study was underway in 2016. The governments of Cyprus, Israel and Greece actively support the project however more options are on the table for Cyprus and Israel. On the other hand exploration is ongoing and new discoveries might influence investment decisions. This project represents one of the options included in the proposal of the govern- ment of Cyprus, in the TYNDP 2017–26, under code TRA-N-1146, aiming at lifting the energy isolation of Cyprus and includes also, inter alia, a pipeline from the gas fields to the Vassiliko area, a FSRU installed at the same area, transmission infra- structure to supply power stations with gas and small scale LNG facilities. The IGI-Poseidon project consisted of a new offshore pipeline that would connect the westwards extension of the Greek transmission system, i. e. the Komotini- Thesprotia pipeline (TRA-N-014), with the Italian one. The project also includes a compressor station at Kipi at the GR/TR border (TRA-N-128) that will provide the necessary increased capacity to the DESFA system. The main objective of the IGI- Poseidon project was to complete the natural gas corridor through Turkey, Greece and Italy (Interconnection Turkey Greece Italy – ITGI), enabling Italy and the rest of Europe to import natural gas from the Caspian Sea and the Middle East. This way it would contribute to the security and diversification of European energy supply. The design capacity of the IGI-Poseidon project was 12 billion cubic meters per year. After the selection of TAP, for the same purpose, by the Shach Deniz consortium, both above projects were put on hold. However, the cancellation of the South Stream pipeline may be a valid reason to keep this project alive. In February 2016, indeed, “ the Shareholders of IGI Poseidon, respectively DEPA SA with 50% and Edison SpA with 50%, signed with Gazprom the ‘Memorandum of Understanding in relation to gas supplies from Russia across the Black sea through third countries to Greece and from Greece and Italy’ to develop a gas pipeline project between Greece and Italy, enabling the realization of a new route for gas supply ”   2) .A further agreement was signed by the three parties in St. Petersburg, in June 2017. IGI-Poseidon (TRA-N-010) According to its main promoter, the Eastring Project connects Central and Western Europe with Southeastern Europe, routing from SK–UA border via Hungary and Romania to an external border of the EU on the territory of Bulgaria. The main goal of the project is to create a bi-directional cross-border pipeline of approx. 1,100km with capacity up to 40bcm/a in the final phase. Commissioning is planned for 2021 (first phase) and 2025 (final phase). The Project incorporates di- rect connections to national transmission systems of involved countries, so these countries can benefit on a strategic level by enhancing their status on the European energy map. The project could allow the flow of gas in both directions – the Balkan region will have the possibility to be supplied with gas coming from northern sources/routes including LNG from the Polish LNG terminal via the planned Polish – Slovak interconnector or Central Europe with eastern gas and central and western Europe- an region will get access to gas from the Caspian region or other eastern sources. The Eastring Project would (i) secure supply in case of RU disruption and therefore it will increase SoS in the broader Central-South-East EU region, (ii) allow access to alternative gas sources, (iii) mean step towards EU single gas market. In November 2016 the promoters of the project requested the co-financing of a feasibility study by the EU CEF programme, based on its PCI status. In 2017 the financial support for the feasibility study was approved and the project promoters were provided with financial sources from the EU CEF programme of 50% out of total eligible costs. Eastring (TRA-N-628, TRA-N-654, TRA-N-655, TRA-N-656)

 2) Source: IGI Poseidon website http://www.igi-poseidon.com/en-drupal/media/poseidon-gazprom-depa-and-edison-sign- memorandum-understanding

Southern Corridor GRIP 2017–2026 |

85

Made with FlippingBook - Online magazine maker